Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The pile foundation fixing structure for water conservancy construction comprises a base and a pile column body movably installed at the top of the base, the bottom of the pile column body is fixedly connected with an installation block, the bottoms of the two sides of the pile column body are fixedly connected with installation frames, and an installation cavity is formed in the base. According to the device, through rotation of the rotating head, clamping and positioning of the second clamping groove by the second clamping block can be achieved, meanwhile, positioning of the first clamping groove by the first clamping block is achieved, the pile body can be stably installed and fixed to the base, operation can be achieved only through rotation of the rotating head, operation is easy, and the practicability is high. The pile body is convenient to fix and use by people, the trouble that an existing pile body needs to be installed and fixed on the base through many bolts is avoided, in this way, the installing and fixing process is very convenient, the installing and fixing efficiency is greatly improved, and the using requirement for existing rapid installing and fixing is met.
本发明公开了一种水利建设用的桩基固定结构,包括基座和活动安装于基座顶部的桩柱主体,所述桩柱主体的底部固定连接有安装块,桩柱主体的两侧底部均固定连接有安装架,所述基座的内部设有安装腔。本发明中,通过旋转头的旋转,不仅能够实现第二卡块对第二卡槽的卡装定位,同时还实现了第一卡块对第一卡槽的定位,从而能够将桩柱主体稳固的安装固定在基座上,且只需要对通过旋转头的旋转即可操作,使得操作简单,便于人们固定使用,避免现有桩柱主体还需要通过较多的螺栓来安装固定在基座上的麻烦,这样使得安装固定的过程中非常方便,大大提高了安装固定的效率,满足了现有快速安装固定的使用需求。
The pile foundation fixing structure for water conservancy construction comprises a base and a pile column body movably installed at the top of the base, the bottom of the pile column body is fixedly connected with an installation block, the bottoms of the two sides of the pile column body are fixedly connected with installation frames, and an installation cavity is formed in the base. According to the device, through rotation of the rotating head, clamping and positioning of the second clamping groove by the second clamping block can be achieved, meanwhile, positioning of the first clamping groove by the first clamping block is achieved, the pile body can be stably installed and fixed to the base, operation can be achieved only through rotation of the rotating head, operation is easy, and the practicability is high. The pile body is convenient to fix and use by people, the trouble that an existing pile body needs to be installed and fixed on the base through many bolts is avoided, in this way, the installing and fixing process is very convenient, the installing and fixing efficiency is greatly improved, and the using requirement for existing rapid installing and fixing is met.
本发明公开了一种水利建设用的桩基固定结构,包括基座和活动安装于基座顶部的桩柱主体,所述桩柱主体的底部固定连接有安装块,桩柱主体的两侧底部均固定连接有安装架,所述基座的内部设有安装腔。本发明中,通过旋转头的旋转,不仅能够实现第二卡块对第二卡槽的卡装定位,同时还实现了第一卡块对第一卡槽的定位,从而能够将桩柱主体稳固的安装固定在基座上,且只需要对通过旋转头的旋转即可操作,使得操作简单,便于人们固定使用,避免现有桩柱主体还需要通过较多的螺栓来安装固定在基座上的麻烦,这样使得安装固定的过程中非常方便,大大提高了安装固定的效率,满足了现有快速安装固定的使用需求。
Pile foundation structure for water conservancy construction engineering
Europäisches Patentamt | 2023
|Environment-protecting bridge pile foundation construction method for water conservancy construction
Europäisches Patentamt | 2020
|Riverbed pile foundation carrying device for water conservancy project construction
Europäisches Patentamt | 2021
|