Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile foundation structure for water conservancy construction engineering
The invention discloses a pile foundation structure for a water conservancy construction project. The pile foundation structure comprises a pile foundation pipe, a steel bar frame, a plurality of fixing pins and a ground pile. The reinforcing steel bar frame is connected into the pile foundation pipe in a sleeved mode, the pile foundation pipe is of a hollow cylinder structure, a bottom plate matched with the pile foundation pipe is arranged at the bottom end in the pile foundation pipe, the ground pile is arranged on the bottom plate in a penetrating and inserting mode, the ground pile is obliquely arranged and inserted into soil, and the fixing pins are arranged on the inner wall of the pile foundation pipe in a penetrating and inserting mode in the circumferential direction. The fixing pin is transversely arranged and inserted into soil, and a screw rod is rotatably arranged on the bottom plate. The fixing pins and the ground piles can be synchronously inserted into the soil, the transverse and vertical fixing effect between the pile foundation pipes and the soil is improved, the pile foundation pipes, the steel bar frame, the fixing pins and the ground piles are effectively combined through concrete pouring, the pile foundation pipes and the surrounding soil jointly bear horizontal external force, and the possibility of displacement and sinking of the pile foundation pipes is effectively avoided; the displacement and sinking prevention capability is improved, a plurality of ground nails are not needed for fixing one by one, and the fixing efficiency is improved.
本发明公开了一种水利建设工程用桩基结构,包括桩基管、钢筋框架、若干固定销和地桩;所述钢筋框架套接在桩基管内,所述桩基管为中空筒体结构,所述桩基管内部的底端设置有与其适配的底板,所述地桩穿插设置在底板上,所述地桩呈倾斜设置并插入泥土中,所述固定销呈周向穿插设置在桩基管的内壁上,所述固定销横向设置并插入泥土里,所述底板上可转动设置有螺杆。固定销和地桩可同步插入泥土中,提高桩基管和泥土之间横向和竖向的固定效果,浇筑混凝土使桩基管、钢筋框架、固定销和地桩有效的结合,桩基管与周围泥土共同承受水平外力,有效避免桩基管位移和下陷的可能性,提高防位移和下陷能力,不需要多根地钉逐一进行固定,提高固定效率。
Pile foundation structure for water conservancy construction engineering
The invention discloses a pile foundation structure for a water conservancy construction project. The pile foundation structure comprises a pile foundation pipe, a steel bar frame, a plurality of fixing pins and a ground pile. The reinforcing steel bar frame is connected into the pile foundation pipe in a sleeved mode, the pile foundation pipe is of a hollow cylinder structure, a bottom plate matched with the pile foundation pipe is arranged at the bottom end in the pile foundation pipe, the ground pile is arranged on the bottom plate in a penetrating and inserting mode, the ground pile is obliquely arranged and inserted into soil, and the fixing pins are arranged on the inner wall of the pile foundation pipe in a penetrating and inserting mode in the circumferential direction. The fixing pin is transversely arranged and inserted into soil, and a screw rod is rotatably arranged on the bottom plate. The fixing pins and the ground piles can be synchronously inserted into the soil, the transverse and vertical fixing effect between the pile foundation pipes and the soil is improved, the pile foundation pipes, the steel bar frame, the fixing pins and the ground piles are effectively combined through concrete pouring, the pile foundation pipes and the surrounding soil jointly bear horizontal external force, and the possibility of displacement and sinking of the pile foundation pipes is effectively avoided; the displacement and sinking prevention capability is improved, a plurality of ground nails are not needed for fixing one by one, and the fixing efficiency is improved.
本发明公开了一种水利建设工程用桩基结构,包括桩基管、钢筋框架、若干固定销和地桩;所述钢筋框架套接在桩基管内,所述桩基管为中空筒体结构,所述桩基管内部的底端设置有与其适配的底板,所述地桩穿插设置在底板上,所述地桩呈倾斜设置并插入泥土中,所述固定销呈周向穿插设置在桩基管的内壁上,所述固定销横向设置并插入泥土里,所述底板上可转动设置有螺杆。固定销和地桩可同步插入泥土中,提高桩基管和泥土之间横向和竖向的固定效果,浇筑混凝土使桩基管、钢筋框架、固定销和地桩有效的结合,桩基管与周围泥土共同承受水平外力,有效避免桩基管位移和下陷的可能性,提高防位移和下陷能力,不需要多根地钉逐一进行固定,提高固定效率。
Pile foundation structure for water conservancy construction engineering
一种水利建设工程用桩基结构
GUO ZHAOBO (Autor:in) / GAO YESONG (Autor:in) / RAO JIE (Autor:in) / LIU XIAOJING (Autor:in) / SON MIN-CHUL (Autor:in) / ZHANG CHI (Autor:in) / JIN TAO (Autor:in)
29.12.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile foundation fixing structure for water conservancy construction
Europäisches Patentamt | 2022
|Environment-protecting bridge pile foundation construction method for water conservancy construction
Europäisches Patentamt | 2020
|Riverbed pile foundation carrying device for water conservancy project construction
Europäisches Patentamt | 2021
|Water conservancy construction pipe pile installation construction technology
Europäisches Patentamt | 2022
|