Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Jacket assembling method adopting standardized nodes
The invention relates to a jacket assembling method adopting standardized nodes. The jacket assembling method comprises the following steps: prefabricating a main facade frame of a jacket; prefabricating horizontal layer flower pieces of the jacket; prefabricating a main vertical face X pattern supporting piece and a side vertical face X pattern supporting piece of the jacket; and horizontally assembling the prefabricated main vertical face frame, the horizontal layer flower pieces, the main vertical face X supporting flower pieces and the side vertical face X supporting flower pieces of the jacket to complete the assembly of the main body frame of the jacket. The jacket is split into the standardized series of pipe joints and rod piece sections, the standardized series of pipe joints and rod piece sections can be prefabricated in batches in a factory and then are welded and assembled in a construction site, the joints and rod pieces are assembled and welded in the construction site, automatic welding can be achieved, and the construction period can be greatly shortened.
本发明涉及一种采用标准化节点的导管架组装方法,包括:预制导管架的主立面框架;预制导管架的水平层花片;预制导管架的主立面X撑花片和侧立面X撑花片;将预制的导管架的主立面框架、水平层花片、主立面X撑花片及侧立面X撑花片进行卧式组装,完成导管架主体框架的组装。本发明将导管架拆分为标准化系列的管节点和杆件段,标准化系列的管节点和杆件段可以在工厂进行批量化预制,然后在建造场地进行焊接组装,在建造场地对节点和杆件进行组装焊接,可实现自动焊,能够大幅缩短建造工期。
Jacket assembling method adopting standardized nodes
The invention relates to a jacket assembling method adopting standardized nodes. The jacket assembling method comprises the following steps: prefabricating a main facade frame of a jacket; prefabricating horizontal layer flower pieces of the jacket; prefabricating a main vertical face X pattern supporting piece and a side vertical face X pattern supporting piece of the jacket; and horizontally assembling the prefabricated main vertical face frame, the horizontal layer flower pieces, the main vertical face X supporting flower pieces and the side vertical face X supporting flower pieces of the jacket to complete the assembly of the main body frame of the jacket. The jacket is split into the standardized series of pipe joints and rod piece sections, the standardized series of pipe joints and rod piece sections can be prefabricated in batches in a factory and then are welded and assembled in a construction site, the joints and rod pieces are assembled and welded in the construction site, automatic welding can be achieved, and the construction period can be greatly shortened.
本发明涉及一种采用标准化节点的导管架组装方法,包括:预制导管架的主立面框架;预制导管架的水平层花片;预制导管架的主立面X撑花片和侧立面X撑花片;将预制的导管架的主立面框架、水平层花片、主立面X撑花片及侧立面X撑花片进行卧式组装,完成导管架主体框架的组装。本发明将导管架拆分为标准化系列的管节点和杆件段,标准化系列的管节点和杆件段可以在工厂进行批量化预制,然后在建造场地进行焊接组装,在建造场地对节点和杆件进行组装焊接,可实现自动焊,能够大幅缩短建造工期。
Jacket assembling method adopting standardized nodes
一种采用标准化节点的导管架组装方法
SUN YOUYI (Autor:in) / LI DA (Autor:in) / SHEN XIAOPENG (Autor:in) / CHEN BANGMIN (Autor:in) / FU DIANFU (Autor:in) / ZHANG HUI (Autor:in) / SHAO WEIDONG (Autor:in) / LIANG WENZHOU (Autor:in) / ZHANG BAOJUN (Autor:in) / WANG LIQIN (Autor:in)
09.08.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Method for assembling multi-leg jacket by adopting TKY standardized nodes
Europäisches Patentamt | 2023
|Method for building standardized shallow water jacket
Europäisches Patentamt | 2023
|Shallow water standardized jacket, system and installation method thereof
Europäisches Patentamt | 2024
|