Upper module built by adopting standardized nodes
The invention discloses an upper module built by adopting standardized nodes, which is of a frame structure formed by main leg upright posts penetrating through each layer of deck of the upper module, deck main beams connected with the main leg upright posts and vertical surface diagonal draw bars in vertical surfaces connected with the main leg upright posts, the main legs are connected with the deck main beam through standardized joints, and the vertical face diagonal braces are connected with the main legs and the deck main beam through standardized joints. According to the method, prefabrication and warehouse preparation of the tubular joint standardized parts are carried out in advance, platform deck formation can be completed through rapid assembly of the prefabricated standardized joints and surrounding structural beams when actual project requirements exist, the final assembly efficiency of block construction is improved, and then the overall construction period is shortened. Meanwhile, the workload of aerial assembly welding operation of large-size pipe joints is avoided through the standardized pipe type joints, aerial assembly welding operation of saddle openings between the round pipes is changed into ground operation of prefabrication in advance, and the manufacturing precision and quality of the pipe joints can be improved advantageously.
本发明公开了一种采用标准化节点建造的上部组块,上部组块由贯穿于上部组块各层甲板的主腿立柱、与主腿立柱相连的甲板主梁和与主腿立柱相连的立面中的立面斜拉筋形成框架结构,主腿与甲板主梁之间、立面斜拉筋与主腿和甲板主梁之间都采用标准化节点连接。本发明提前进行管式节点标准化部件的预制和备库,待有实际项目需求时即可通过已经预制完成的标准化节点与周围结构梁的快速组对完成平台甲板成片,提高组块建造的总装效率,进而缩短整体建造周期。同时,标准化的管式节点避免了大尺寸管节点空中组对焊接作业工作量,将圆管之间的马鞍口空中组对焊接工作变为提前预制的地面作业,有利于提高管节点的制造精度和质量。
Upper module built by adopting standardized nodes
The invention discloses an upper module built by adopting standardized nodes, which is of a frame structure formed by main leg upright posts penetrating through each layer of deck of the upper module, deck main beams connected with the main leg upright posts and vertical surface diagonal draw bars in vertical surfaces connected with the main leg upright posts, the main legs are connected with the deck main beam through standardized joints, and the vertical face diagonal braces are connected with the main legs and the deck main beam through standardized joints. According to the method, prefabrication and warehouse preparation of the tubular joint standardized parts are carried out in advance, platform deck formation can be completed through rapid assembly of the prefabricated standardized joints and surrounding structural beams when actual project requirements exist, the final assembly efficiency of block construction is improved, and then the overall construction period is shortened. Meanwhile, the workload of aerial assembly welding operation of large-size pipe joints is avoided through the standardized pipe type joints, aerial assembly welding operation of saddle openings between the round pipes is changed into ground operation of prefabrication in advance, and the manufacturing precision and quality of the pipe joints can be improved advantageously.
本发明公开了一种采用标准化节点建造的上部组块,上部组块由贯穿于上部组块各层甲板的主腿立柱、与主腿立柱相连的甲板主梁和与主腿立柱相连的立面中的立面斜拉筋形成框架结构,主腿与甲板主梁之间、立面斜拉筋与主腿和甲板主梁之间都采用标准化节点连接。本发明提前进行管式节点标准化部件的预制和备库,待有实际项目需求时即可通过已经预制完成的标准化节点与周围结构梁的快速组对完成平台甲板成片,提高组块建造的总装效率,进而缩短整体建造周期。同时,标准化的管式节点避免了大尺寸管节点空中组对焊接作业工作量,将圆管之间的马鞍口空中组对焊接工作变为提前预制的地面作业,有利于提高管节点的制造精度和质量。
Upper module built by adopting standardized nodes
一种采用标准化节点建造的上部组块
CAI YUANLANG (Autor:in) / SUN HAO (Autor:in) / XIN XIAOHUI (Autor:in) / WANG XIAOLEI (Autor:in) / DENG HEXIA (Autor:in) / WEN ZHIFEI (Autor:in) / WEN YU (Autor:in) / YU ZHIQIANG (Autor:in) / ZHANG XING (Autor:in) / GAO WEI (Autor:in)
24.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Method for assembling multi-leg jacket by adopting TKY standardized nodes
Europäisches Patentamt | 2023
|Transformer substation building structure built by adopting prefabricated parts
Europäisches Patentamt | 2020
|Construction method of latticed underground diaphragm wall adopting pile type nodes
Europäisches Patentamt | 2023
|