Method for assembling multi-leg jacket by adopting TKY standardized nodes
The invention discloses a method for assembling a multi-leg jacket by adopting TKY standardized nodes, which is characterized in that the TKY standardized nodes are connected with horizontal pipes and main legs with different specifications to form a multi-leg jacket structural framework, and jackets with different heights can be assembled. By prefabricating the joints and the rod pieces in batches in advance and quickly assembling the joints and the rod pieces, construction of the jacket is completed, so that the utilization rate of construction machines and tools is greatly improved, the final assembly efficiency of construction of the jacket is improved, and the engineering construction period is shortened. The application of the standardized node can reduce the high-altitude welding operation of the node, improve the manufacturing precision and quality of the node, and create conditions for intelligent manufacturing and modular construction of the jacket at the same time.
本发明公开了一种采用TKY标准化节点组装多腿导管架的方法,通过TKY标准化节点与不同规格的水平管、主腿连接成多腿导管架结构框架,能够实现组装成不同高度的导管架。本发明通过提前批量预制节点和杆件,快速组装这些节点和杆件,完成导管架建造,从而大幅提高建造机具利用率,提高导管架建造总装效率,缩短工程建设周期。标准化节点的应用还可以减少节点高空焊接作业,提高节点制造精度和质量,同时也为导管架智能制造和模块化建造创造了条件。
Method for assembling multi-leg jacket by adopting TKY standardized nodes
The invention discloses a method for assembling a multi-leg jacket by adopting TKY standardized nodes, which is characterized in that the TKY standardized nodes are connected with horizontal pipes and main legs with different specifications to form a multi-leg jacket structural framework, and jackets with different heights can be assembled. By prefabricating the joints and the rod pieces in batches in advance and quickly assembling the joints and the rod pieces, construction of the jacket is completed, so that the utilization rate of construction machines and tools is greatly improved, the final assembly efficiency of construction of the jacket is improved, and the engineering construction period is shortened. The application of the standardized node can reduce the high-altitude welding operation of the node, improve the manufacturing precision and quality of the node, and create conditions for intelligent manufacturing and modular construction of the jacket at the same time.
本发明公开了一种采用TKY标准化节点组装多腿导管架的方法,通过TKY标准化节点与不同规格的水平管、主腿连接成多腿导管架结构框架,能够实现组装成不同高度的导管架。本发明通过提前批量预制节点和杆件,快速组装这些节点和杆件,完成导管架建造,从而大幅提高建造机具利用率,提高导管架建造总装效率,缩短工程建设周期。标准化节点的应用还可以减少节点高空焊接作业,提高节点制造精度和质量,同时也为导管架智能制造和模块化建造创造了条件。
Method for assembling multi-leg jacket by adopting TKY standardized nodes
一种采用TKY标准化节点组装多腿导管架的方法
HOU TAO (Autor:in) / HUANG HUAIZHOU (Autor:in) / SONG ZHENGRONG (Autor:in) / CAI YUANLANG (Autor:in) / SUN JINHUA (Autor:in) / YUAN YUJIE (Autor:in) / CHEN XIN (Autor:in) / WANG MINGGUO (Autor:in) / XIN XIAOHUI (Autor:in) / LIU DONGLIANG (Autor:in)
07.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Method for building standardized shallow water jacket
Europäisches Patentamt | 2023
|Shallow water standardized jacket, system and installation method thereof
Europäisches Patentamt | 2024
|