Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Polluted underground water treatment method for building construction polluted soil
The invention relates to the technical field of sewage treatment, in particular to a polluted groundwater treatment method for building construction polluted soil, which comprises the following steps: determining the excavation volume depth of a treatment pond and the number of precipitation wells through calculation, and then drawing a plane arrangement schematic diagram for the treatment pond and the precipitation wells; construction of a water treatment site and a dewatering well is conducted after construction earlier-stage treatment is conducted on the area to be constructed, dewatering is conducted through a tube well, meanwhile, underground water is treated, and water treatment is conducted in later foundation pit construction; the method is reasonable in overall design, building construction and polluted underground water treatment are conducted at the same time, and rapid construction is effectively guaranteed; in addition, treatment on the underground water of the building construction site has important significance on safe construction of building construction.
本发明涉及污水处理技术领域,具体涉及一种用于建筑施工污染土壤的污染地下水处理方法,包括:通过计算确定处理池开挖体积深度以及降水井数量,然后对处理池、降水井进行平面布置示意图的绘制;对待施工区域进行施工前期处理后进行水处理场地和降水井的施工,在通过管井降水且同时对地下水进行水处理并在后期基坑施工中同时进行水处理;本发明方法整体设计合理,将建筑施工与污染地下水处理同时进行,有效地保证快速施工;并且,对建筑施工场地地下水进行处理对建筑施工的安全施工具备重要意义。
Polluted underground water treatment method for building construction polluted soil
The invention relates to the technical field of sewage treatment, in particular to a polluted groundwater treatment method for building construction polluted soil, which comprises the following steps: determining the excavation volume depth of a treatment pond and the number of precipitation wells through calculation, and then drawing a plane arrangement schematic diagram for the treatment pond and the precipitation wells; construction of a water treatment site and a dewatering well is conducted after construction earlier-stage treatment is conducted on the area to be constructed, dewatering is conducted through a tube well, meanwhile, underground water is treated, and water treatment is conducted in later foundation pit construction; the method is reasonable in overall design, building construction and polluted underground water treatment are conducted at the same time, and rapid construction is effectively guaranteed; in addition, treatment on the underground water of the building construction site has important significance on safe construction of building construction.
本发明涉及污水处理技术领域,具体涉及一种用于建筑施工污染土壤的污染地下水处理方法,包括:通过计算确定处理池开挖体积深度以及降水井数量,然后对处理池、降水井进行平面布置示意图的绘制;对待施工区域进行施工前期处理后进行水处理场地和降水井的施工,在通过管井降水且同时对地下水进行水处理并在后期基坑施工中同时进行水处理;本发明方法整体设计合理,将建筑施工与污染地下水处理同时进行,有效地保证快速施工;并且,对建筑施工场地地下水进行处理对建筑施工的安全施工具备重要意义。
Polluted underground water treatment method for building construction polluted soil
一种用于建筑施工污染土壤的污染地下水处理方法
LIU GUOQIANG (Autor:in) / ZHANG YA (Autor:in) / GAN XINHONG (Autor:in) / CHEN YUDONG (Autor:in) / WANG JIAN (Autor:in) / LI XUWEI (Autor:in) / WANG XIAOHAN (Autor:in)
23.08.2022
Patent
Elektronische Ressource
Chinesisch
Multi-point extraction treatment system for polluted underground water
Europäisches Patentamt | 2020
|In-situ remediation system for polluted underground water and construction method thereof
Europäisches Patentamt | 2020
|Aerodynamic interception system for controlling polluted underground water
Europäisches Patentamt | 2024
|