Mounting method for super high-rise building steel structure construction
The invention relates to the technical field of building construction, and discloses an installation method for super high-rise building steel structure construction, which comprises the following steps: S1, preparation: installing tower crane equipment at a construction point, counting the number of steel plates, and carrying out acceptance and stacking; s2, assembly fixing is conducted, specifically, long steel plates in the steel structure are placed and fixed through fixing equipment, meanwhile, short steel plates are installed between the two long steel plates, different numbers of short steel plates are sequentially installed according to the needed shape of the steel structure, and the steel plates are fixed through the fixing equipment; and the levelness between the short steel plate and the long steel plate is adjusted through positioning adjustment. According to the step of trial hoisting, the stability of the rigging can be ensured, the situation that the steel structure slides down and causes safety accidents during hoisting is prevented, the safety performance of steel structure installation is improved, the safety accidents caused by the fact that the hand of a ground worker is not completely separated from a hook during hanging can be prevented, and the hoisting safety is improved.
本发明涉及建筑施工技术领域,且公开了一种超高层建筑钢结构施工用的安装方法,包括以下步骤:S1:预准备,在施工点安装塔吊设备,并对钢板数量进行清点,进行验收堆放;S2:组件固定,将钢结构中长度较长的钢板进行摆放,并且用固定设备将其进行固定,同时将较短的钢板安装到两个长度较长的钢板的中间,根据所需要的钢结构的形状,来依次安装不同数量的短钢板,并且通过定位调节来调节短钢板与长钢板之间的水平度。本发明进行试吊的步骤能够确保索具的稳定性,防止在吊运时钢结构滑落,引发安全事故,提高了钢结构安装的安全性能,能够防止地面工作人员挂装时手未完全脱离挂钩引发的安全事故,提高了吊运的安全性。
Mounting method for super high-rise building steel structure construction
The invention relates to the technical field of building construction, and discloses an installation method for super high-rise building steel structure construction, which comprises the following steps: S1, preparation: installing tower crane equipment at a construction point, counting the number of steel plates, and carrying out acceptance and stacking; s2, assembly fixing is conducted, specifically, long steel plates in the steel structure are placed and fixed through fixing equipment, meanwhile, short steel plates are installed between the two long steel plates, different numbers of short steel plates are sequentially installed according to the needed shape of the steel structure, and the steel plates are fixed through the fixing equipment; and the levelness between the short steel plate and the long steel plate is adjusted through positioning adjustment. According to the step of trial hoisting, the stability of the rigging can be ensured, the situation that the steel structure slides down and causes safety accidents during hoisting is prevented, the safety performance of steel structure installation is improved, the safety accidents caused by the fact that the hand of a ground worker is not completely separated from a hook during hanging can be prevented, and the hoisting safety is improved.
本发明涉及建筑施工技术领域,且公开了一种超高层建筑钢结构施工用的安装方法,包括以下步骤:S1:预准备,在施工点安装塔吊设备,并对钢板数量进行清点,进行验收堆放;S2:组件固定,将钢结构中长度较长的钢板进行摆放,并且用固定设备将其进行固定,同时将较短的钢板安装到两个长度较长的钢板的中间,根据所需要的钢结构的形状,来依次安装不同数量的短钢板,并且通过定位调节来调节短钢板与长钢板之间的水平度。本发明进行试吊的步骤能够确保索具的稳定性,防止在吊运时钢结构滑落,引发安全事故,提高了钢结构安装的安全性能,能够防止地面工作人员挂装时手未完全脱离挂钩引发的安全事故,提高了吊运的安全性。
Mounting method for super high-rise building steel structure construction
一种超高层建筑钢结构施工用的安装方法
WANG YONGHAO (Autor:in) / LI JIANAN (Autor:in)
06.09.2022
Patent
Elektronische Ressource
Chinesisch
Construction and installation method for super high-rise building steel structure
Europäisches Patentamt | 2021
|Super high-rise steel beam structure and mounting method thereof
Europäisches Patentamt | 2024
|Construction and installation method of super high-rise building steel structure
Europäisches Patentamt | 2023
|Construction method for steel structure podium building of core tube super high-rise building
Europäisches Patentamt | 2023
|Edge sealing beam structure of super high-rise steel structure building and construction method
Europäisches Patentamt | 2020
|