Construction method for steel structure podium building of core tube super high-rise building
The invention discloses a construction method for a steel structure podium building of a core tube super high-rise building. The construction method comprises the steps that S1, a construction area of a core tube is determined; s2, high floors of the temporary columns and the podium building steel structures are constructed on the periphery of the construction area, so that the temporary columns can support the podium building steel structures of the adjacent floors; constructing a lower floor of the core tube in the construction area; s3, the podium building steel structure is connected to the core tube; and S4, concrete is poured into the podium building. Before the core tube is constructed, the podium building steel structure is supported by the temporary columns, so that the construction of the podium building steel structure can be started before the core tube is formed, and compared with the prior art that the construction of the podium building steel structure can be performed after the core tube is formed, the construction period of the podium building is greatly shortened.
本发明公开了一种核心筒超高层的钢结构裙楼施工方法,包括:S1、确定核心筒的施工区域;S2、于施工区域的外围施工临时柱和裙楼钢结构的较高楼层,以使临时柱能够支撑相邻楼层的裙楼钢结构;于施工区域内施工核心筒的较低楼层;S3、将裙楼钢结构连接到核心筒;S4、对裙楼浇筑混凝土。在核心筒施工前,利用临时柱以支撑裙楼钢结构,从而,在核心筒成型前便能够开始裙楼钢结构的施工,相比于现有技术中需要在核心筒成型后才能进行裙楼钢结构的施工,本发明大大缩短了裙楼的施工工期。
Construction method for steel structure podium building of core tube super high-rise building
The invention discloses a construction method for a steel structure podium building of a core tube super high-rise building. The construction method comprises the steps that S1, a construction area of a core tube is determined; s2, high floors of the temporary columns and the podium building steel structures are constructed on the periphery of the construction area, so that the temporary columns can support the podium building steel structures of the adjacent floors; constructing a lower floor of the core tube in the construction area; s3, the podium building steel structure is connected to the core tube; and S4, concrete is poured into the podium building. Before the core tube is constructed, the podium building steel structure is supported by the temporary columns, so that the construction of the podium building steel structure can be started before the core tube is formed, and compared with the prior art that the construction of the podium building steel structure can be performed after the core tube is formed, the construction period of the podium building is greatly shortened.
本发明公开了一种核心筒超高层的钢结构裙楼施工方法,包括:S1、确定核心筒的施工区域;S2、于施工区域的外围施工临时柱和裙楼钢结构的较高楼层,以使临时柱能够支撑相邻楼层的裙楼钢结构;于施工区域内施工核心筒的较低楼层;S3、将裙楼钢结构连接到核心筒;S4、对裙楼浇筑混凝土。在核心筒施工前,利用临时柱以支撑裙楼钢结构,从而,在核心筒成型前便能够开始裙楼钢结构的施工,相比于现有技术中需要在核心筒成型后才能进行裙楼钢结构的施工,本发明大大缩短了裙楼的施工工期。
Construction method for steel structure podium building of core tube super high-rise building
一种核心筒超高层的钢结构裙楼施工方法
ZHANG BIAO (Autor:in) / RAO JIAYUAN (Autor:in) / LIU HUANYUN (Autor:in) / ZHANG KAI (Autor:in) / DONG JING (Autor:in) / ZHANG XUEFEI (Autor:in) / TANG CHUFA (Autor:in) / WANG YOULIANG (Autor:in) / YU FANGQI (Autor:in)
04.07.2023
Patent
Elektronische Ressource
Chinesisch
Construction method for building core tube inclined wall of super high-rise building
Europäisches Patentamt | 2022
|Steel pipe beam for frame core tube structure super high-rise building
Europäisches Patentamt | 2021
|Super high-rise building large-fall core tube concrete pouring construction method
Europäisches Patentamt | 2020
|Construction method for variable cross-section core tube of super high-rise building
Europäisches Patentamt | 2023
|Mounting method for super high-rise building steel structure construction
Europäisches Patentamt | 2022
|