Blast furnace shell welding protective shed erecting method
The invention relates to a blast furnace shell welding protective shed erecting method which comprises the following steps that S1, a vertical plate on a clamping plate is fixed to a furnace shell through a bolt, a transverse plate fixes a transverse rod through a support, and the inclination degree between the transverse rod and the horizontal plane is 5%; s2, three scaffold pipes are fixed to the cross rod, and the scaffold pipes are distributed on the two end edges and the middle position of the cross rod; s3, canvas is laid on the scaffold pipes, and the canvas covers the furnace shell; and S4, a platform is installed on the furnace shell and covered with canvas, and a constructor welds the furnace shell on the platform through carbon dioxide arc welding. According to the characteristics of construction materials such as scaffold tubes on a construction site and the structure of a blast furnace shell, a detachable support which is easy to manufacture and install is adopted, and the furnace shell is supported by bolts.
本发明涉及一种高炉炉壳焊接保护棚搭设方法,包括以下步骤:S1、将卡板上的竖版通过螺栓固定在炉壳上,横板通过支架固定横杆,所述横杆与水平面的倾斜度为5%;S2、将三根脚手管固定在横杆上,所述脚手管分布在横杆的两端边和中间位置;S3、将帆布铺设在脚手管上,所述帆布将炉壳覆盖;S4、炉壳上安装有平台,帆布将平台覆盖,施工人员在平台上采用二氧化碳气体保护焊对炉壳进行焊接。通过施工现场的施工材料如(脚手管)和高炉炉壳的结构的特点,采用制作简单,安装简便的可拆卸支架,用螺栓顶住炉壳。
Blast furnace shell welding protective shed erecting method
The invention relates to a blast furnace shell welding protective shed erecting method which comprises the following steps that S1, a vertical plate on a clamping plate is fixed to a furnace shell through a bolt, a transverse plate fixes a transverse rod through a support, and the inclination degree between the transverse rod and the horizontal plane is 5%; s2, three scaffold pipes are fixed to the cross rod, and the scaffold pipes are distributed on the two end edges and the middle position of the cross rod; s3, canvas is laid on the scaffold pipes, and the canvas covers the furnace shell; and S4, a platform is installed on the furnace shell and covered with canvas, and a constructor welds the furnace shell on the platform through carbon dioxide arc welding. According to the characteristics of construction materials such as scaffold tubes on a construction site and the structure of a blast furnace shell, a detachable support which is easy to manufacture and install is adopted, and the furnace shell is supported by bolts.
本发明涉及一种高炉炉壳焊接保护棚搭设方法,包括以下步骤:S1、将卡板上的竖版通过螺栓固定在炉壳上,横板通过支架固定横杆,所述横杆与水平面的倾斜度为5%;S2、将三根脚手管固定在横杆上,所述脚手管分布在横杆的两端边和中间位置;S3、将帆布铺设在脚手管上,所述帆布将炉壳覆盖;S4、炉壳上安装有平台,帆布将平台覆盖,施工人员在平台上采用二氧化碳气体保护焊对炉壳进行焊接。通过施工现场的施工材料如(脚手管)和高炉炉壳的结构的特点,采用制作简单,安装简便的可拆卸支架,用螺栓顶住炉壳。
Blast furnace shell welding protective shed erecting method
一种高炉炉壳焊接保护棚搭设方法
JIA LING (Autor:in) / JIN BIN (Autor:in) / NING XIANHAI (Autor:in)
13.12.2022
Patent
Elektronische Ressource
Chinesisch
Mounting method of modularized blast furnace in-situ major-repair protective shed
Europäisches Patentamt | 2020
|Protective shed frame for overpass construction of crossing railway and erecting method
Europäisches Patentamt | 2020
|Furnace shell winter welding heat preservation shed and construction protection method thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|Method for erecting greenhouse device for blast furnace foundation construction.
Europäisches Patentamt | 2022
|