Construction method of steel reinforced concrete composite structure of clean workshop
The invention discloses a construction method of a clean workshop steel reinforced concrete composite structure, and relates to the technical field of engineering. The method comprises the following steps: a, positioning according to a drawing, constructing a first section of steel column after binding a raft bottom bar, binding a surface bar after the construction of the first section of steel column, and pouring concrete, so as to complete a steel reinforced concrete composite structure foundation; b, according to the position of the first section of steel column, construction of second and third sections of steel columns is conducted, the second and third sections of steel columns are spliced into a whole on the ground for hoisting construction, and the steel columns are installed at the position 1.2 m above the raft foundation in a butt joint mode; and c, after the steel columns are completed, the steel trusses are hoisted, and all the steel trusses need to be transported to the site in a scattered mode. The concrete structure is constructed after the steel structure is constructed to form the whole stressed body, namely, the steel structure is constructed to the top layer firstly, and then lower civil construction is performed alternately, so that site construction organization is facilitated, the construction period can be effectively shortened, and the cost is saved.
本发明公开了一种洁净厂房型钢混凝土组合结构的施工方法,涉及工程技术领域。本发明步骤如下:a.根据图纸定位,在筏板底筋绑扎完毕后进行首节钢柱施工,首节钢柱施工完毕后进行面筋绑扎,再进行混凝土浇筑,进而完成型钢混凝土组合结构基础;b.根据首节钢柱位置,进行二三节钢柱施工,二三节钢柱在地面拼装成整体进行吊装施工,钢柱安装对接位置在筏板基础上1.2m的位置;c.在钢柱完成后进行钢桁架吊装,所有钢桁架需散件运输至现场。本发明通过在钢结构施工完毕形成受力整体后再进行混凝土结构施工,即先施工钢结构至顶层,再穿插进行下部土建施工,便于现场施工组织,能够有效节省工期,节约成本。
Construction method of steel reinforced concrete composite structure of clean workshop
The invention discloses a construction method of a clean workshop steel reinforced concrete composite structure, and relates to the technical field of engineering. The method comprises the following steps: a, positioning according to a drawing, constructing a first section of steel column after binding a raft bottom bar, binding a surface bar after the construction of the first section of steel column, and pouring concrete, so as to complete a steel reinforced concrete composite structure foundation; b, according to the position of the first section of steel column, construction of second and third sections of steel columns is conducted, the second and third sections of steel columns are spliced into a whole on the ground for hoisting construction, and the steel columns are installed at the position 1.2 m above the raft foundation in a butt joint mode; and c, after the steel columns are completed, the steel trusses are hoisted, and all the steel trusses need to be transported to the site in a scattered mode. The concrete structure is constructed after the steel structure is constructed to form the whole stressed body, namely, the steel structure is constructed to the top layer firstly, and then lower civil construction is performed alternately, so that site construction organization is facilitated, the construction period can be effectively shortened, and the cost is saved.
本发明公开了一种洁净厂房型钢混凝土组合结构的施工方法,涉及工程技术领域。本发明步骤如下:a.根据图纸定位,在筏板底筋绑扎完毕后进行首节钢柱施工,首节钢柱施工完毕后进行面筋绑扎,再进行混凝土浇筑,进而完成型钢混凝土组合结构基础;b.根据首节钢柱位置,进行二三节钢柱施工,二三节钢柱在地面拼装成整体进行吊装施工,钢柱安装对接位置在筏板基础上1.2m的位置;c.在钢柱完成后进行钢桁架吊装,所有钢桁架需散件运输至现场。本发明通过在钢结构施工完毕形成受力整体后再进行混凝土结构施工,即先施工钢结构至顶层,再穿插进行下部土建施工,便于现场施工组织,能够有效节省工期,节约成本。
Construction method of steel reinforced concrete composite structure of clean workshop
一种洁净厂房型钢混凝土组合结构的施工方法
WANG GUOQIANG (Autor:in) / DING DANGSHENG (Autor:in) / LI XIWEI (Autor:in) / DU GENG (Autor:in) / QIU JIANYUE (Autor:in) / LI PENGCHENG (Autor:in)
03.01.2023
Patent
Elektronische Ressource
Chinesisch
Construction method of steel reinforced concrete composite structure
Europäisches Patentamt | 2022
|Reverse construction method for steel reinforced concrete composite structure
Europäisches Patentamt | 2023
|Steel beam sliding construction method of steel reinforced concrete composite structure
Europäisches Patentamt | 2022
|Construction method of fabricated steel reinforced concrete superposed beam composite structure
Europäisches Patentamt | 2024
|Fabricated FRP pipe-steel reinforced concrete composite structure and construction method