Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Modular construction tool and method for straight wall reinforcement cage
The straight wall reinforcement cage modular construction tool comprises two plane frame-shaped frameworks which are arranged in parallel, the plane frame-shaped frameworks comprise transverse frameworks and vertical frameworks which are transversely and longitudinally staggered and vertically connected, and a plurality of connecting frameworks are vertically connected between the two plane frame-shaped frameworks to form a three-dimensional frame-shaped framework; a plurality of reinforcing steel bar limiting structures with semi-arc-shaped clamping grooves are arranged on the upper side wall of the vertical framework, a plurality of reinforcing steel bar limiting structures are also arranged on the side wall of the connecting framework, the axis of the clamping grooves in the vertical framework is parallel to the transverse framework, and the axis of the clamping grooves in the connecting framework is parallel to the vertical framework. The detachable construction tool assists all layers of reinforcing meshes of the wall body to be prefabricated layer by layer outside a site to form an integral reinforcing cage, reinforcing steel bar binding work is transferred to the ground to be prefabricated in advance, then connection with reinforcing steel bars reserved on site is achieved through mechanical connectors, the construction efficiency is greatly improved, and the construction cost is reduced. And meanwhile, it can be guaranteed that the manufactured steel reinforcement cage can be accurately in butt joint with steel bars reserved on site.
本发明公开了一种直墙钢筋笼模块化施工工装及方法,包括两个平行设置的平面框形骨架,所述平面框形骨架包括横纵交错垂直连接的横向骨架和竖向骨架,两个平面框形骨架之间垂直连接有多个连接骨架形成立体框形骨架;竖向骨架上侧壁上设置有多个具有半圆弧形卡槽的钢筋限位结构,连接骨架的侧壁上也设置有多个钢筋限位结构,竖向骨架上的卡槽轴线与横向骨架平行,连接骨架上的卡槽轴线与竖向骨架平行。本发明通过可拆卸式的施工工装辅助墙体各层钢筋网片在场外逐层预制成整体钢筋笼,将钢筋绑扎的工作转移到地面提前预制,然后通过机械接头实现与现场预留钢筋的连接,大大提高了施工效率,同时能够保证制得的钢筋笼能够与现场预留钢筋精准对接。
Modular construction tool and method for straight wall reinforcement cage
The straight wall reinforcement cage modular construction tool comprises two plane frame-shaped frameworks which are arranged in parallel, the plane frame-shaped frameworks comprise transverse frameworks and vertical frameworks which are transversely and longitudinally staggered and vertically connected, and a plurality of connecting frameworks are vertically connected between the two plane frame-shaped frameworks to form a three-dimensional frame-shaped framework; a plurality of reinforcing steel bar limiting structures with semi-arc-shaped clamping grooves are arranged on the upper side wall of the vertical framework, a plurality of reinforcing steel bar limiting structures are also arranged on the side wall of the connecting framework, the axis of the clamping grooves in the vertical framework is parallel to the transverse framework, and the axis of the clamping grooves in the connecting framework is parallel to the vertical framework. The detachable construction tool assists all layers of reinforcing meshes of the wall body to be prefabricated layer by layer outside a site to form an integral reinforcing cage, reinforcing steel bar binding work is transferred to the ground to be prefabricated in advance, then connection with reinforcing steel bars reserved on site is achieved through mechanical connectors, the construction efficiency is greatly improved, and the construction cost is reduced. And meanwhile, it can be guaranteed that the manufactured steel reinforcement cage can be accurately in butt joint with steel bars reserved on site.
本发明公开了一种直墙钢筋笼模块化施工工装及方法,包括两个平行设置的平面框形骨架,所述平面框形骨架包括横纵交错垂直连接的横向骨架和竖向骨架,两个平面框形骨架之间垂直连接有多个连接骨架形成立体框形骨架;竖向骨架上侧壁上设置有多个具有半圆弧形卡槽的钢筋限位结构,连接骨架的侧壁上也设置有多个钢筋限位结构,竖向骨架上的卡槽轴线与横向骨架平行,连接骨架上的卡槽轴线与竖向骨架平行。本发明通过可拆卸式的施工工装辅助墙体各层钢筋网片在场外逐层预制成整体钢筋笼,将钢筋绑扎的工作转移到地面提前预制,然后通过机械接头实现与现场预留钢筋的连接,大大提高了施工效率,同时能够保证制得的钢筋笼能够与现场预留钢筋精准对接。
Modular construction tool and method for straight wall reinforcement cage
一种直墙钢筋笼模块化施工工装及方法
QU LU (Autor:in) / WANG XUANXUAN (Autor:in) / XU CHUNFU (Autor:in) / ZOU SHAOJUN (Autor:in) / YIN GUANGSHI (Autor:in) / LIU XIAGUANG (Autor:in) / WANG HU (Autor:in) / YANG HONGMEI (Autor:in) / ZUO FENGQIN (Autor:in) / ZHANG ZIHONG (Autor:in)
17.01.2023
Patent
Elektronische Ressource
Chinesisch
Modular construction method for U-shaped wall reinforcement cage
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Modular prefabrication tool for U-shaped wall reinforcement cage
Europäisches Patentamt | 2022
|Diaphragm wall reinforcement cage and construction method thereof
Europäisches Patentamt | 2024
|Construction method of underground diaphragm wall reinforcement cage
Europäisches Patentamt | 2023
|