Mass concrete construction curing system and curing method thereof
The mass concrete construction curing system comprises a first flow dividing pipe set and a water storage tank, the first flow dividing pipe set is connected with multiple sets of water seepage vertical pipes at equal intervals, the water seepage vertical pipes are connected with water seepage transverse pipes at equal intervals, and water seepage openings are formed in the water seepage vertical pipes and the water seepage transverse pipes; a plurality of groups of spraying pipes are equidistantly arranged on the upper side of the water seepage transverse pipe; and the reservoir is connected with the water seepage transverse pipe through a water pump. Water infiltrates into concrete through the water seepage holes of the water seepage transverse pipes and the water seepage vertical pipes to cool the concrete; and the upper side of the concrete is cooled in a manner of spraying cooling water through a spraying pipe, so that the temperature in the concrete is balanced, and the concrete hardening efficiency is improved.
本发明公开了一种大体积混凝土施工养护系统及其养护方法,包括第一分流管组与蓄水池,第一分流管组等距连接有多组渗水竖管,渗水竖管等距连接有渗水横管,渗水竖管与渗水横管均开设有渗水口,渗水横管的上侧等距离设有多组喷淋管;所述蓄水池通过水泵与渗水横管连接。本发明通过渗水横管与渗水竖管的渗水孔渗入混凝土内对混凝土进行降温;通过喷管去喷洒冷却水的方式,对混凝土上侧进行降温,平衡了混凝土内部的温度,提高了对混凝土硬化的效率。
Mass concrete construction curing system and curing method thereof
The mass concrete construction curing system comprises a first flow dividing pipe set and a water storage tank, the first flow dividing pipe set is connected with multiple sets of water seepage vertical pipes at equal intervals, the water seepage vertical pipes are connected with water seepage transverse pipes at equal intervals, and water seepage openings are formed in the water seepage vertical pipes and the water seepage transverse pipes; a plurality of groups of spraying pipes are equidistantly arranged on the upper side of the water seepage transverse pipe; and the reservoir is connected with the water seepage transverse pipe through a water pump. Water infiltrates into concrete through the water seepage holes of the water seepage transverse pipes and the water seepage vertical pipes to cool the concrete; and the upper side of the concrete is cooled in a manner of spraying cooling water through a spraying pipe, so that the temperature in the concrete is balanced, and the concrete hardening efficiency is improved.
本发明公开了一种大体积混凝土施工养护系统及其养护方法,包括第一分流管组与蓄水池,第一分流管组等距连接有多组渗水竖管,渗水竖管等距连接有渗水横管,渗水竖管与渗水横管均开设有渗水口,渗水横管的上侧等距离设有多组喷淋管;所述蓄水池通过水泵与渗水横管连接。本发明通过渗水横管与渗水竖管的渗水孔渗入混凝土内对混凝土进行降温;通过喷管去喷洒冷却水的方式,对混凝土上侧进行降温,平衡了混凝土内部的温度,提高了对混凝土硬化的效率。
Mass concrete construction curing system and curing method thereof
一种大体积混凝土施工养护系统及其养护方法
FU YONG (Autor:in) / WANG YONG (Autor:in) / ZHAO HONGCHUN (Autor:in) / YING WUDANG (Autor:in) / LIU BIN (Autor:in) / XUE LIGANG (Autor:in) / ZOU PEI (Autor:in)
31.01.2023
Patent
Elektronische Ressource
Chinesisch
Mass concrete curing system and construction method thereof
Europäisches Patentamt | 2024
|Mass concrete curing equipment and construction method thereof
Europäisches Patentamt | 2023
|Building construction concrete curing device and curing method thereof
Europäisches Patentamt | 2023
|Concrete curing construction method and curing device
Europäisches Patentamt | 2015
|