Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Impact bridge erecting operation mechanism and operation method
The embodiment of the invention provides an impact bridge erecting operation mechanism and method, and relates to the field of impact bridges. The impact bridge erecting operation mechanism comprises a carrier loader assembly, an erecting assembly and an impact bridge assembly. The bearing frame rotates along with pushing of the suspension arm, the lower end of the bearing frame gradually supports the ground, after the bearing frame supports the ground, the next step of erecting of the impact bridge assembly is conducted, the bearing frame is supported by the double-swing-arm lifting piece and the ground, and the double-swing-arm lifting piece is supported by the rear end of a deck on the top of the carrier loader. According to the impact bridge erecting operation mechanism, the front end of an armored car is not used, a high-strength deck structure at the rear end of the armored car is used for supporting and adding, meanwhile, the bearing frame is supported through the ground, the distance between supporting points is increased, vehicle inclination during impact bridge erecting is reduced, and when the impact bridge erecting operation mechanism is added to the armored car, supporting is stable, and the service life is long. And the structural strength is high.
本申请实施例提供冲击桥架设作业机构及作业方法,涉及冲击桥领域。冲击桥架设作业机构及作业方法包括:运载车组件、架设组件和冲击桥组件。承载架自身随吊臂的推动而转动,承载架下端逐渐支撑住地面,承载架支撑住地面后,再进行冲击桥组件架设的下一步骤的作业,承载架通过双摆臂升高件和地面进行支撑,双摆臂升高件通过运载车顶部甲板的后端进行支撑,该冲击桥架设作业机构未使用装甲车前端,利用装甲车后端的强度较高甲板结构进行支撑加装,同时承载架利用地面进行支撑,增大支撑点之间的间距,减少冲击桥架设时车辆的倾斜,使装甲车加装冲击桥架设作业机构时,具有支撑稳固,结构强度高的效果。
Impact bridge erecting operation mechanism and operation method
The embodiment of the invention provides an impact bridge erecting operation mechanism and method, and relates to the field of impact bridges. The impact bridge erecting operation mechanism comprises a carrier loader assembly, an erecting assembly and an impact bridge assembly. The bearing frame rotates along with pushing of the suspension arm, the lower end of the bearing frame gradually supports the ground, after the bearing frame supports the ground, the next step of erecting of the impact bridge assembly is conducted, the bearing frame is supported by the double-swing-arm lifting piece and the ground, and the double-swing-arm lifting piece is supported by the rear end of a deck on the top of the carrier loader. According to the impact bridge erecting operation mechanism, the front end of an armored car is not used, a high-strength deck structure at the rear end of the armored car is used for supporting and adding, meanwhile, the bearing frame is supported through the ground, the distance between supporting points is increased, vehicle inclination during impact bridge erecting is reduced, and when the impact bridge erecting operation mechanism is added to the armored car, supporting is stable, and the service life is long. And the structural strength is high.
本申请实施例提供冲击桥架设作业机构及作业方法,涉及冲击桥领域。冲击桥架设作业机构及作业方法包括:运载车组件、架设组件和冲击桥组件。承载架自身随吊臂的推动而转动,承载架下端逐渐支撑住地面,承载架支撑住地面后,再进行冲击桥组件架设的下一步骤的作业,承载架通过双摆臂升高件和地面进行支撑,双摆臂升高件通过运载车顶部甲板的后端进行支撑,该冲击桥架设作业机构未使用装甲车前端,利用装甲车后端的强度较高甲板结构进行支撑加装,同时承载架利用地面进行支撑,增大支撑点之间的间距,减少冲击桥架设时车辆的倾斜,使装甲车加装冲击桥架设作业机构时,具有支撑稳固,结构强度高的效果。
Impact bridge erecting operation mechanism and operation method
冲击桥架设作业机构及作业方法
ZHOU ZILAI (Autor:in) / ZHU KUI (Autor:in) / LI WANG (Autor:in) / SUN YUN (Autor:in) / ZHU HAIQING (Autor:in)
07.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Tail erecting type operation mechanism for impact bridge
Europäisches Patentamt | 2023
|Erecting mechanism, erecting device and bridge erecting vehicle
Europäisches Patentamt | 2021
|Mechanical bridge erecting mechanism and mechanical bridge erecting vehicle and method
Europäisches Patentamt | 2020
|Self-heightening bridge pier erecting system and operation method thereof
Europäisches Patentamt | 2023
|