Guide wall construction method
The guide wall construction method comprises the following steps that the guide wall construction position is determined, and the site of the guide wall construction position is leveled; guide walls are constructed on the guide wall construction positions along the two sides of the axis of the underground wall in the mode of controlling the perpendicularity deviation; the top elevation of the guide wall is controlled according to preset guide wall top surface flatness allowable deviation, so that the top elevation of the guide wall is within the preset guide wall top surface flatness allowable deviation; and after it is determined that the strength of the guide wall meets the preset strength requirement, earth is rammed in the middle of the guide wall. The method is used for controlling the perpendicularity deviation of the guide wall and the top elevation of the guide wall.
本发明公开了一种导墙施工方法,包括以下步骤:确定导墙施工位置,并平整导墙施工位置的场地;通过控制垂直度偏差的形式在导墙施工位置沿地下墙轴线的两侧构筑导墙;按照预设的导墙顶面平整度容许偏差控制所述导墙的顶标高,以使所述导墙的顶标高处于所述预设的导墙顶面平整度容许偏差内;在确定导墙的强度符合预设的强度要求后,在导墙中间夯土。用于控制导墙的垂直度偏差以及导墙的顶标高。
Guide wall construction method
The guide wall construction method comprises the following steps that the guide wall construction position is determined, and the site of the guide wall construction position is leveled; guide walls are constructed on the guide wall construction positions along the two sides of the axis of the underground wall in the mode of controlling the perpendicularity deviation; the top elevation of the guide wall is controlled according to preset guide wall top surface flatness allowable deviation, so that the top elevation of the guide wall is within the preset guide wall top surface flatness allowable deviation; and after it is determined that the strength of the guide wall meets the preset strength requirement, earth is rammed in the middle of the guide wall. The method is used for controlling the perpendicularity deviation of the guide wall and the top elevation of the guide wall.
本发明公开了一种导墙施工方法,包括以下步骤:确定导墙施工位置,并平整导墙施工位置的场地;通过控制垂直度偏差的形式在导墙施工位置沿地下墙轴线的两侧构筑导墙;按照预设的导墙顶面平整度容许偏差控制所述导墙的顶标高,以使所述导墙的顶标高处于所述预设的导墙顶面平整度容许偏差内;在确定导墙的强度符合预设的强度要求后,在导墙中间夯土。用于控制导墙的垂直度偏差以及导墙的顶标高。
Guide wall construction method
导墙施工方法
SONG PENGJIE (Autor:in) / LYU YONGJUN (Autor:in) / ZHU DEQUAN (Autor:in) / ZHANG ZHENGXU (Autor:in) / CHEN WANG (Autor:in) / WANG YONGFENG (Autor:in) / CAO YONGGANG (Autor:in) / ZHANG JIE (Autor:in) / WANG YUTENG (Autor:in) / CHEN CHANGLIN (Autor:in)
07.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Guide wall construction method and guide wall construction structure
Europäisches Patentamt | 2020
|Steel guide wall for underground continuous wall and construction method of steel guide wall
Europäisches Patentamt | 2021
|