Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Guide wall construction method
The invention provides a guide wall construction method, guide walls are located at the downstream of a dam and comprise a first guide wall and a second guide wall, a hydropower station is arranged on the left side of the dam, discharge gates are sequentially arranged on the right side of the dam, and the discharge gates comprise a left gate and a right gate. The first flow guide wall is located between the hydropower station and the left side gate, the second flow guide wall is located between the left side gate and the right side gate, the length of the second flow guide wall is larger than that of the first flow guide wall, the construction method is reasonably designed, construction of the flow guide walls of the downstream of the dam is achieved, and stable running of downstream water flow is guaranteed.
本发明提供一种导流墙施工方法,所述导流墙位于大坝下游,包括第一导流墙和第二导流墙,所述大坝的左侧设置有水电站,所述大坝的右侧依次设置有泄流闸门,所述泄流闸门包括左侧闸门和右侧闸门,所述第一导流墙位于所述水电站与所述左侧闸门之间,所述第二导流墙位于所述左侧闸门和右侧闸门之间,所述第二导流墙长度大于所述第一导流墙长度,通过合理设计施工方法,实现大坝下游的导流墙施工,保证下游水流的平稳运行。
Guide wall construction method
The invention provides a guide wall construction method, guide walls are located at the downstream of a dam and comprise a first guide wall and a second guide wall, a hydropower station is arranged on the left side of the dam, discharge gates are sequentially arranged on the right side of the dam, and the discharge gates comprise a left gate and a right gate. The first flow guide wall is located between the hydropower station and the left side gate, the second flow guide wall is located between the left side gate and the right side gate, the length of the second flow guide wall is larger than that of the first flow guide wall, the construction method is reasonably designed, construction of the flow guide walls of the downstream of the dam is achieved, and stable running of downstream water flow is guaranteed.
本发明提供一种导流墙施工方法,所述导流墙位于大坝下游,包括第一导流墙和第二导流墙,所述大坝的左侧设置有水电站,所述大坝的右侧依次设置有泄流闸门,所述泄流闸门包括左侧闸门和右侧闸门,所述第一导流墙位于所述水电站与所述左侧闸门之间,所述第二导流墙位于所述左侧闸门和右侧闸门之间,所述第二导流墙长度大于所述第一导流墙长度,通过合理设计施工方法,实现大坝下游的导流墙施工,保证下游水流的平稳运行。
Guide wall construction method
一种导流墙施工方法
YOU YAJUAN (Autor:in) / ZHANG FENGCAI (Autor:in) / SU FANGCHAO (Autor:in) / YANG YANG (Autor:in) / YOU CHAOGANG (Autor:in) / WANG ZHANCANG (Autor:in) / LI YADAN (Autor:in) / YANG GUANGZHEN (Autor:in) / YOU JINGYA (Autor:in)
12.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Guide wall construction method and guide wall construction structure
Europäisches Patentamt | 2020
|Steel guide wall for underground continuous wall and construction method of steel guide wall
Europäisches Patentamt | 2021
|