Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Installation method for giant steel beam connecting plate
The invention discloses a mounting method for a giant steel beam connecting plate, which relates to the field of steel structures and comprises the following mounting steps: fixedly mounting an auxiliary device, fixing the connecting plate by using the auxiliary device, hoisting a steel beam to a mounting position, overturning the connecting plate, overturning the connecting plate to a fixed position, mounting a bolt and dismounting the auxiliary device. The overturning principle is adopted, the connecting plate is installed on the giant steel beam on the ground, accurate positioning can be achieved only by overturning the connecting plate during high-altitude butt joint, the problem that the connecting plate of the giant steel beam is large in weight and difficult to carry and adjust manually at high altitude is solved, time and labor are saved, and safety and reliability are achieved.
本发明公开了一种用于巨型钢梁连接板的安装方法,涉及钢结构领域,包括以下安装步骤:固定安装辅助装置,利用辅助装置固定连接板,钢梁吊装到安装位置,翻转连接板,连接板翻转至固定位,安装螺栓,拆除辅助装置。本发明采用了翻转原理,在地面就将连接板安装在巨型钢梁上,高空对接时仅需翻转连接板即可精确定位,解决了巨型钢梁的连接板重量很大,在高空人力难以搬运和调整的问题,省时省力,安全可靠。
Installation method for giant steel beam connecting plate
The invention discloses a mounting method for a giant steel beam connecting plate, which relates to the field of steel structures and comprises the following mounting steps: fixedly mounting an auxiliary device, fixing the connecting plate by using the auxiliary device, hoisting a steel beam to a mounting position, overturning the connecting plate, overturning the connecting plate to a fixed position, mounting a bolt and dismounting the auxiliary device. The overturning principle is adopted, the connecting plate is installed on the giant steel beam on the ground, accurate positioning can be achieved only by overturning the connecting plate during high-altitude butt joint, the problem that the connecting plate of the giant steel beam is large in weight and difficult to carry and adjust manually at high altitude is solved, time and labor are saved, and safety and reliability are achieved.
本发明公开了一种用于巨型钢梁连接板的安装方法,涉及钢结构领域,包括以下安装步骤:固定安装辅助装置,利用辅助装置固定连接板,钢梁吊装到安装位置,翻转连接板,连接板翻转至固定位,安装螺栓,拆除辅助装置。本发明采用了翻转原理,在地面就将连接板安装在巨型钢梁上,高空对接时仅需翻转连接板即可精确定位,解决了巨型钢梁的连接板重量很大,在高空人力难以搬运和调整的问题,省时省力,安全可靠。
Installation method for giant steel beam connecting plate
一种用于巨型钢梁连接板的安装方法
LI ANG (Autor:in) / ZOU JIANLEI (Autor:in) / CHANG CHENG (Autor:in) / WANG XINGNAN (Autor:in) / WU DI (Autor:in) / YU LIQIANG (Autor:in) / GENG XUTAO (Autor:in) / YAN LIGUO (Autor:in) / LIU ZHEN (Autor:in) / LI MINGHANG (Autor:in)
17.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Steel beam connecting plate mounting device and steel beam connecting plate mounting method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Steel beam high-altitude connecting plate and connecting method thereof
Europäisches Patentamt | 2020
|Bearing connecting structure based on steel plate corrugated ceiling installation
Europäisches Patentamt | 2024
|