Cast-in-place beam construction full framing foundation treatment structure and construction method thereof
The invention discloses a cast-in-place beam construction full framing foundation treatment structure and a construction method thereof, a high-density polyethylene PP plate is arranged on a concrete foundation surface before a cast-in-place box beam full framing foundation concrete is poured and a bracket is erected, and an anti-skid layer is arranged on the bottom surface of the high-density polyethylene PP plate; the high-density polyethylene PP plates are provided with hoisting holes used for installing hoisting rings, the high-density polyethylene PP plates are of nine specifications, wedge-shaped blocks or wedge-shaped reserved openings are formed in the high-density polyethylene PP plates, the sum of the number of the wedge-shaped blocks or the wedge-shaped reserved openings formed in each high-density polyethylene PP plate is 2-4, and the number of the wedge-shaped blocks or the wedge-shaped reserved openings formed in each high-density polyethylene PP plate is 2-4. The foundation treatment time is effectively shortened, the construction cost is reduced, and the strength of cast-in-place beam construction full framing foundation treatment and the overall stability of the framing can be effectively guaranteed.
本发明公开了一种现浇梁施工满堂支架基础处理结构及其施工方法,通过在现浇箱梁满堂支架基础混凝土浇筑完成支架搭设之前在混凝土基础面上设置有高密度聚乙烯PP板,高密度聚乙烯PP板底面设有防滑层,高密度聚乙烯PP板上设有用于安装吊环的吊装孔,高密度聚乙烯PP板九种规格,高密度聚乙烯PP板上设有楔形块或楔形预留口,每块所述高密度聚乙烯PP板上设置的楔形块或楔形预留口的数量之和为2~4个,有效缩短基础处理的时间、降低工程造价、能有效保证现浇梁施工满堂支架基础处理的强度及支架的整体稳定性。
Cast-in-place beam construction full framing foundation treatment structure and construction method thereof
The invention discloses a cast-in-place beam construction full framing foundation treatment structure and a construction method thereof, a high-density polyethylene PP plate is arranged on a concrete foundation surface before a cast-in-place box beam full framing foundation concrete is poured and a bracket is erected, and an anti-skid layer is arranged on the bottom surface of the high-density polyethylene PP plate; the high-density polyethylene PP plates are provided with hoisting holes used for installing hoisting rings, the high-density polyethylene PP plates are of nine specifications, wedge-shaped blocks or wedge-shaped reserved openings are formed in the high-density polyethylene PP plates, the sum of the number of the wedge-shaped blocks or the wedge-shaped reserved openings formed in each high-density polyethylene PP plate is 2-4, and the number of the wedge-shaped blocks or the wedge-shaped reserved openings formed in each high-density polyethylene PP plate is 2-4. The foundation treatment time is effectively shortened, the construction cost is reduced, and the strength of cast-in-place beam construction full framing foundation treatment and the overall stability of the framing can be effectively guaranteed.
本发明公开了一种现浇梁施工满堂支架基础处理结构及其施工方法,通过在现浇箱梁满堂支架基础混凝土浇筑完成支架搭设之前在混凝土基础面上设置有高密度聚乙烯PP板,高密度聚乙烯PP板底面设有防滑层,高密度聚乙烯PP板上设有用于安装吊环的吊装孔,高密度聚乙烯PP板九种规格,高密度聚乙烯PP板上设有楔形块或楔形预留口,每块所述高密度聚乙烯PP板上设置的楔形块或楔形预留口的数量之和为2~4个,有效缩短基础处理的时间、降低工程造价、能有效保证现浇梁施工满堂支架基础处理的强度及支架的整体稳定性。
Cast-in-place beam construction full framing foundation treatment structure and construction method thereof
一种现浇梁施工满堂支架基础处理结构及其施工方法
ZHANG JUNZHI (Autor:in) / FANG YI (Autor:in)
21.03.2023
Patent
Elektronische Ressource
Chinesisch
Construction method for cast-in-place beam construction full framing foundation treatment
Europäisches Patentamt | 2023
|Full framing turnover foundation structure and construction method thereof
Europäisches Patentamt | 2022
|Recyclable full framing foundation and construction method thereof
Europäisches Patentamt | 2023
|Bridge construction method of full framing cast-in-place box girder
Europäisches Patentamt | 2022
|Cast-in-place beam full framing integral moving method
Europäisches Patentamt | 2020
|