Construction method for cast-in-place beam construction full framing foundation treatment
The invention discloses a construction method for cast-in-place beam construction full framing foundation treatment, and relates to the technical field of cast-in-place beam full framing foundation treatment. Comprising the following steps that firstly, foundation concrete is poured; secondly, high-density polyethylene PP plates are spliced on the surface of the foundation concrete, and an anti-skid layer is arranged between the high-density polyethylene PP plates and the foundation concrete; and thirdly, a full framing is erected on the high-density polyethylene PP plate. Due to the fact that the high-density polyethylene PP plates are high in strength, the cast-in-place beam full framing foundation replacement filling treatment depth can be reduced by fully paving the high-density polyethylene PP plates, the foundation replacement filling treatment cost is greatly reduced, the foundation treatment time is saved, the overall strength of the full framing foundation is improved, and finally the purposes of improving the project quality, saving the construction period and reducing the construction cost are achieved. And the construction cost is reduced.
本发明为一种现浇梁施工满堂支架基础处理的施工方法,涉及现浇梁满堂支架基础处理技术领域。包括如下步骤:步骤一、浇筑基础混凝土;步骤二、在基础混凝土表面拼装高密度聚乙烯PP板,其中,在高密度聚乙烯PP板与基础混凝土之间设有防滑层;步骤三、在高密度聚乙烯PP板上架设满堂支架。由于高密度聚乙烯PP板强度较高,通过满铺高密度聚乙烯PP板可以将现浇梁满堂支架基础换填处理深度减少,从而大大减少基础换填处理成本,节约基础处理时间,增加满堂支架基础整体强度,最终达到提高工程质量,节约工期,降低施工成本的目的。
Construction method for cast-in-place beam construction full framing foundation treatment
The invention discloses a construction method for cast-in-place beam construction full framing foundation treatment, and relates to the technical field of cast-in-place beam full framing foundation treatment. Comprising the following steps that firstly, foundation concrete is poured; secondly, high-density polyethylene PP plates are spliced on the surface of the foundation concrete, and an anti-skid layer is arranged between the high-density polyethylene PP plates and the foundation concrete; and thirdly, a full framing is erected on the high-density polyethylene PP plate. Due to the fact that the high-density polyethylene PP plates are high in strength, the cast-in-place beam full framing foundation replacement filling treatment depth can be reduced by fully paving the high-density polyethylene PP plates, the foundation replacement filling treatment cost is greatly reduced, the foundation treatment time is saved, the overall strength of the full framing foundation is improved, and finally the purposes of improving the project quality, saving the construction period and reducing the construction cost are achieved. And the construction cost is reduced.
本发明为一种现浇梁施工满堂支架基础处理的施工方法,涉及现浇梁满堂支架基础处理技术领域。包括如下步骤:步骤一、浇筑基础混凝土;步骤二、在基础混凝土表面拼装高密度聚乙烯PP板,其中,在高密度聚乙烯PP板与基础混凝土之间设有防滑层;步骤三、在高密度聚乙烯PP板上架设满堂支架。由于高密度聚乙烯PP板强度较高,通过满铺高密度聚乙烯PP板可以将现浇梁满堂支架基础换填处理深度减少,从而大大减少基础换填处理成本,节约基础处理时间,增加满堂支架基础整体强度,最终达到提高工程质量,节约工期,降低施工成本的目的。
Construction method for cast-in-place beam construction full framing foundation treatment
一种现浇梁施工满堂支架基础处理的施工方法
ZHANG JUNZHI (Autor:in)
06.06.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|Bridge construction method of full framing cast-in-place box girder
Europäisches Patentamt | 2022
|Cast-in-place beam full framing integral moving method
Europäisches Patentamt | 2020
|Recyclable full framing foundation and construction method thereof
Europäisches Patentamt | 2023
|Full framing turnover foundation structure and construction method thereof
Europäisches Patentamt | 2022
|