Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Iron tower foot facilitating main material replacement and working method thereof
The invention relates to an iron tower foot convenient for main material replacement, which comprises a tower foot connecting piece, the tower foot connecting piece is fastened on a mounting surface through a foundation bolt, the tower foot connecting piece is fixedly connected with inclined material angle steel and second main material angle steel through a connecting bolt, the top of the second main material angle steel is fixedly connected with splicing angle steel through a connecting bolt, and the splicing angle steel is fixedly connected with a second main material angle steel through a connecting bolt. The top of the splicing angle steel is fixedly connected with first main material angle steel through a connecting bolt, and the tower foot connecting piece, the connecting end of the tower foot connecting piece and the inclined material angle steel and the connecting end of the tower foot connecting piece and the second main material angle steel are all embedded in the concrete protective cap. The tower foot is embedded in the concrete protective cap and is prevented from being rusted, so that the tower foot is prevented from being replaced; the rusted parts are concentrated on the short second main material angle steel, and the second main material angle steel is connected with the lower tower foot and the upper iron tower through bolts and located near the ground, so that replacement is very convenient.
本发明涉及一种便于主材更换的铁塔塔脚,包括塔脚连接件,所述塔脚连接件经地脚螺栓紧固在安装面上,所述塔脚连接件经连接螺栓固连有斜材角钢与第二主材角钢,所述第二主材角钢顶部经连接螺栓固连有拼接角钢,所述拼接角钢顶部经连接螺栓固连有第一主材角钢,所述塔脚连接件、塔脚连接件与斜材角钢的连接端、塔脚连接件与第二主材角钢的连接端均埋置在混凝土保护帽内部。塔脚被埋置于混凝土保护帽中免于锈蚀,从而免于更换;锈蚀部位集中于短的第二主材角钢,第二主材角钢与下部塔脚、上部铁塔之间采用螺栓连接,且位于地面附近,更换十分方便。
Iron tower foot facilitating main material replacement and working method thereof
The invention relates to an iron tower foot convenient for main material replacement, which comprises a tower foot connecting piece, the tower foot connecting piece is fastened on a mounting surface through a foundation bolt, the tower foot connecting piece is fixedly connected with inclined material angle steel and second main material angle steel through a connecting bolt, the top of the second main material angle steel is fixedly connected with splicing angle steel through a connecting bolt, and the splicing angle steel is fixedly connected with a second main material angle steel through a connecting bolt. The top of the splicing angle steel is fixedly connected with first main material angle steel through a connecting bolt, and the tower foot connecting piece, the connecting end of the tower foot connecting piece and the inclined material angle steel and the connecting end of the tower foot connecting piece and the second main material angle steel are all embedded in the concrete protective cap. The tower foot is embedded in the concrete protective cap and is prevented from being rusted, so that the tower foot is prevented from being replaced; the rusted parts are concentrated on the short second main material angle steel, and the second main material angle steel is connected with the lower tower foot and the upper iron tower through bolts and located near the ground, so that replacement is very convenient.
本发明涉及一种便于主材更换的铁塔塔脚,包括塔脚连接件,所述塔脚连接件经地脚螺栓紧固在安装面上,所述塔脚连接件经连接螺栓固连有斜材角钢与第二主材角钢,所述第二主材角钢顶部经连接螺栓固连有拼接角钢,所述拼接角钢顶部经连接螺栓固连有第一主材角钢,所述塔脚连接件、塔脚连接件与斜材角钢的连接端、塔脚连接件与第二主材角钢的连接端均埋置在混凝土保护帽内部。塔脚被埋置于混凝土保护帽中免于锈蚀,从而免于更换;锈蚀部位集中于短的第二主材角钢,第二主材角钢与下部塔脚、上部铁塔之间采用螺栓连接,且位于地面附近,更换十分方便。
Iron tower foot facilitating main material replacement and working method thereof
一种便于主材更换的铁塔塔脚及其工作方法
ZHANG YANHUI (Autor:in) / FANG CHAOYING (Autor:in) / HAN JICENG (Autor:in) / QIAN JIAN (Autor:in) / XU JUN (Autor:in) / WU HAN (Autor:in) / WANG JIAN (Autor:in) / HUANG YOUCONG (Autor:in) / WANG XIAOJIE (Autor:in) / CHAN SIU-HONG (Autor:in)
21.03.2023
Patent
Elektronische Ressource
Chinesisch
MAIN COLUMN MATERIAL REPLACEMENT METHOD FOR STEEL TOWER
Europäisches Patentamt | 2016
|Europäisches Patentamt | 2015
|Europäisches Patentamt | 2024
|Iron tower iron accessory facilitating cable arrangement
Europäisches Patentamt | 2024
|