Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Connecting structure of indoor precast beam and construction method
The invention discloses a connecting structure of an indoor precast beam and a construction method.The connecting structure of the indoor precast beam comprises a wall hanging plate, the precast beam, a first connecting frame and a second connecting frame, a rectangular groove is formed in one side of the wall hanging plate, and a protrusion is arranged at the end of the precast beam; the first connecting frame and the second connecting frame are arranged between the groove and the bulge; the first connecting frame is arranged in the groove, and the first connecting frame is provided with a first connecting piece; the second connecting frame is arranged on the protrusion, and the second connecting frame is provided with a second connecting piece. The first connecting piece and the second connecting piece are detachably connected into a whole so that the precast beam can be fixed to the side portion of the wall hanging plate. According to the connecting structure and the construction method, the structure is reasonable, construction is convenient and fast, through the first connecting frame and the second connecting frame, connection of the precast beam and the wall hanging plate is achieved, the stress concentration problem of the precast beam and the wall hanging plate is avoided, and the reliability of indoor precast beam connection is guaranteed.
本发明公开了一种室内预制梁的连接结构及施工方法,所述室内预制梁的连接结构包括挂墙板、预制梁、第一连接架和第二连接架,所述挂墙板的一侧配置有矩形的凹槽,所述预制梁的端部配置有凸起,所述第一连接架和第二连接架设置于凹槽与凸起之间;所述第一连接架设置于所述凹槽,所述第一连接架配置有第一连接件;所述第二连接架设置于所述凸起,所述第二连接架配置有第二连接件;所述第一连接件与第二连接件可拆卸地连接为一体,以将预制梁固定于挂墙板的侧部。本发明提供的连接结构及施工方法,其结构合理,施工便捷,通过设置的第一连接架和第二连接架,实现了预制梁与挂墙板的连接,避免两者的应力集中问题,保证了室内预制梁连接的可靠性。
Connecting structure of indoor precast beam and construction method
The invention discloses a connecting structure of an indoor precast beam and a construction method.The connecting structure of the indoor precast beam comprises a wall hanging plate, the precast beam, a first connecting frame and a second connecting frame, a rectangular groove is formed in one side of the wall hanging plate, and a protrusion is arranged at the end of the precast beam; the first connecting frame and the second connecting frame are arranged between the groove and the bulge; the first connecting frame is arranged in the groove, and the first connecting frame is provided with a first connecting piece; the second connecting frame is arranged on the protrusion, and the second connecting frame is provided with a second connecting piece. The first connecting piece and the second connecting piece are detachably connected into a whole so that the precast beam can be fixed to the side portion of the wall hanging plate. According to the connecting structure and the construction method, the structure is reasonable, construction is convenient and fast, through the first connecting frame and the second connecting frame, connection of the precast beam and the wall hanging plate is achieved, the stress concentration problem of the precast beam and the wall hanging plate is avoided, and the reliability of indoor precast beam connection is guaranteed.
本发明公开了一种室内预制梁的连接结构及施工方法,所述室内预制梁的连接结构包括挂墙板、预制梁、第一连接架和第二连接架,所述挂墙板的一侧配置有矩形的凹槽,所述预制梁的端部配置有凸起,所述第一连接架和第二连接架设置于凹槽与凸起之间;所述第一连接架设置于所述凹槽,所述第一连接架配置有第一连接件;所述第二连接架设置于所述凸起,所述第二连接架配置有第二连接件;所述第一连接件与第二连接件可拆卸地连接为一体,以将预制梁固定于挂墙板的侧部。本发明提供的连接结构及施工方法,其结构合理,施工便捷,通过设置的第一连接架和第二连接架,实现了预制梁与挂墙板的连接,避免两者的应力集中问题,保证了室内预制梁连接的可靠性。
Connecting structure of indoor precast beam and construction method
一种室内预制梁的连接结构及施工方法
LYU SHANYONG (Autor:in) / LIU HONGGANG (Autor:in) / LIU JIANG (Autor:in) / ZHUANG XIAOJIE (Autor:in) / CHEN LIE (Autor:in) / MA JIAPENG (Autor:in) / CUI YANLONG (Autor:in)
28.03.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|STRUCTURE OF CONNECTING PRECAST COLUMN AND PRECAST BEAM
Europäisches Patentamt | 2017
|Precast beam transverse connecting structure and connecting method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2015
|Precast pile connecting structure and construction method
Europäisches Patentamt | 2024
|