Asphalt concrete core wall dam and construction method
The embodiment of the invention discloses an asphalt concrete core wall dam and a construction method, the asphalt concrete core wall dam comprises an asphalt concrete core wall, a transition material and a dissipation belt, the dissipation belt is arranged between the asphalt concrete core wall and the transition material, and the dissipation belt is first-grade aggregate with the particle size of 9.5 mm to 4.75 mm. The asphalt concrete core wall dam provided by the embodiment of the invention is simple and easy to implement, the phenomenon that the transition materials are squeezed into the core wall in the construction process of the asphalt concrete core wall can be effectively eliminated due to mutual constraint of the asphalt concrete core wall and the transition materials on the two sides, and then the construction quality of the asphalt concrete core wall is improved; and the service performance of the asphalt concrete core wall is improved.
本申请实施例公开了一种沥青混凝土心墙坝和施工方法,沥青混凝土心墙坝包括了沥青混凝土心墙、过渡料和耗散带,其中耗散带设置在沥青混凝土心墙和过渡料之间,而耗散带为粒径为9.5mm至4.75mm一级骨料。本申请实施例提供的沥青混凝土心墙坝简单易行,能够有效改善因沥青混凝土心墙与两侧过渡料相互约束,有效消除沥青混凝土心墙施工过程中过渡料挤入心墙的现象,进而提升了沥青混凝土心墙施工质量,提升了沥青混凝土心墙的服役性能。
Asphalt concrete core wall dam and construction method
The embodiment of the invention discloses an asphalt concrete core wall dam and a construction method, the asphalt concrete core wall dam comprises an asphalt concrete core wall, a transition material and a dissipation belt, the dissipation belt is arranged between the asphalt concrete core wall and the transition material, and the dissipation belt is first-grade aggregate with the particle size of 9.5 mm to 4.75 mm. The asphalt concrete core wall dam provided by the embodiment of the invention is simple and easy to implement, the phenomenon that the transition materials are squeezed into the core wall in the construction process of the asphalt concrete core wall can be effectively eliminated due to mutual constraint of the asphalt concrete core wall and the transition materials on the two sides, and then the construction quality of the asphalt concrete core wall is improved; and the service performance of the asphalt concrete core wall is improved.
本申请实施例公开了一种沥青混凝土心墙坝和施工方法,沥青混凝土心墙坝包括了沥青混凝土心墙、过渡料和耗散带,其中耗散带设置在沥青混凝土心墙和过渡料之间,而耗散带为粒径为9.5mm至4.75mm一级骨料。本申请实施例提供的沥青混凝土心墙坝简单易行,能够有效改善因沥青混凝土心墙与两侧过渡料相互约束,有效消除沥青混凝土心墙施工过程中过渡料挤入心墙的现象,进而提升了沥青混凝土心墙施工质量,提升了沥青混凝土心墙的服役性能。
Asphalt concrete core wall dam and construction method
沥青混凝土心墙坝和施工方法
ZHOU GANG (Autor:in) / QU MANLI (Autor:in) / GUO KAI (Autor:in) / YING PENGTAO (Autor:in) / SU SHENG (Autor:in) / YU JIANSHENG (Autor:in) / ZHENG JINGXING (Autor:in) / LIU TAO (Autor:in) / LUO ZHAOTAO (Autor:in) / WANG ZHI (Autor:in)
11.04.2023
Patent
Elektronische Ressource
Chinesisch
Asphalt concrete core wall dam and construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Construction method of narrow foundation pit asphalt concrete core wall
Europäisches Patentamt | 2021
|Construction method of asphalt concrete core wall in high altitude area
Europäisches Patentamt | 2023
|