Construction method of tension-compression support light cofferdam
The invention discloses a tension-compression support light cofferdam construction method, and relates to the field of foundation pit construction, and the technical scheme is that the construction method comprises the following steps: S1, an excavation area of a foundation pit is calibrated in a construction area, and a plurality of steel casings are pre-buried in the excavation area; s2, steel pipe piles are embedded in the trend of the boundary line of the excavation area; s3, a foundation pit is excavated, and when the position 0.5 m below the designed elevation of a second support is excavated, a first enclosing purlin is installed on the outer side of the steel pipe pile; s4, pull supports are installed on the multiple steel casings along the boundary line of the excavation area; s5, mounting a second support; s6, when the cofferdam is excavated to be 0.5 m below the designed elevation of the pressing support, enclosing purlins are installed on the inner sides of the steel pipe piles at the designed positions; s7, pressing supports are installed on the multiple steel casings along the boundary line of the excavation area; and S8, after bottom sealing concrete pouring is completed, the pulling and pressing supports are dismantled. The method has the beneficial effects that the situation that a welding mode is used for solving the pulling force problem, stress concentration is caused by large foundation pit deformation, and cofferdam instability is caused is avoided.
本发明公开了一种拉压支座轻型围堰施工方法,涉及基坑施工领域,技术方案为,包括以下步骤:S1、在施工区域内标定出基坑的开挖区域,并在开挖区域内预先埋入若干个钢护筒;S2、沿开挖区域的边界线走向埋入钢管桩;S3、基坑开挖,当挖到第二道支撑设计标高以下0.5m时,在钢管桩的外侧安装第一道围檩;S4、沿开挖区域边界线的若干个钢护筒上安装拉支座;S5、安装第二道支撑;S6、围堰开挖到压支座设计标高以下0.5m时,在设计位置钢管桩内侧安装围檩;S7、沿开挖区域边界线的若干个钢护筒上安装压支座;S8、待封底混凝土浇筑完成拆除拉、压支座。本发明的有益效果是:避免了使用焊接方式解决拉力问题,因基坑变形大,导致应力集中,造成围堰失稳。
Construction method of tension-compression support light cofferdam
The invention discloses a tension-compression support light cofferdam construction method, and relates to the field of foundation pit construction, and the technical scheme is that the construction method comprises the following steps: S1, an excavation area of a foundation pit is calibrated in a construction area, and a plurality of steel casings are pre-buried in the excavation area; s2, steel pipe piles are embedded in the trend of the boundary line of the excavation area; s3, a foundation pit is excavated, and when the position 0.5 m below the designed elevation of a second support is excavated, a first enclosing purlin is installed on the outer side of the steel pipe pile; s4, pull supports are installed on the multiple steel casings along the boundary line of the excavation area; s5, mounting a second support; s6, when the cofferdam is excavated to be 0.5 m below the designed elevation of the pressing support, enclosing purlins are installed on the inner sides of the steel pipe piles at the designed positions; s7, pressing supports are installed on the multiple steel casings along the boundary line of the excavation area; and S8, after bottom sealing concrete pouring is completed, the pulling and pressing supports are dismantled. The method has the beneficial effects that the situation that a welding mode is used for solving the pulling force problem, stress concentration is caused by large foundation pit deformation, and cofferdam instability is caused is avoided.
本发明公开了一种拉压支座轻型围堰施工方法,涉及基坑施工领域,技术方案为,包括以下步骤:S1、在施工区域内标定出基坑的开挖区域,并在开挖区域内预先埋入若干个钢护筒;S2、沿开挖区域的边界线走向埋入钢管桩;S3、基坑开挖,当挖到第二道支撑设计标高以下0.5m时,在钢管桩的外侧安装第一道围檩;S4、沿开挖区域边界线的若干个钢护筒上安装拉支座;S5、安装第二道支撑;S6、围堰开挖到压支座设计标高以下0.5m时,在设计位置钢管桩内侧安装围檩;S7、沿开挖区域边界线的若干个钢护筒上安装压支座;S8、待封底混凝土浇筑完成拆除拉、压支座。本发明的有益效果是:避免了使用焊接方式解决拉力问题,因基坑变形大,导致应力集中,造成围堰失稳。
Construction method of tension-compression support light cofferdam
一种拉压支座轻型围堰施工方法
LIU WEI (Autor:in) / HU FENG (Autor:in) / CUI YANJI (Autor:in) / YANG SHUAI (Autor:in) / LU KAI (Autor:in) / DUAN JIWEI (Autor:in) / YANG GUANGTING (Autor:in) / WEN XIAOKANG (Autor:in) / WANG MINMIN (Autor:in) / GAI ZHONG (Autor:in)
18.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Cofferdam construction method and cofferdam structure
Europäisches Patentamt | 2020
|Adjustable cofferdam structure and cofferdam construction method
Europäisches Patentamt | 2023
|Cofferdam support mechanism and construction support foundation
Europäisches Patentamt | 2023
|