Construction method of tension-compression support light cofferdam
The invention discloses a tension-compression support light cofferdam construction method, and relates to the field of foundation pit construction, and the technical scheme is that the construction method comprises the following steps: S1, an excavation area of a foundation pit is calibrated in a construction area, and a plurality of steel casings are pre-buried in the excavation area; s2, steel pipe piles are embedded in the trend of the boundary line of the excavation area; s3, a foundation pit is excavated, and when the position 0.5 m below the designed elevation of a second support is excavated, a first enclosing purlin is installed on the outer side of the steel pipe pile; s4, pull supports are installed on the multiple steel casings along the boundary line of the excavation area; s5, mounting a second support; s6, when the cofferdam is excavated to be 0.5 m below the designed elevation of the pressing support, enclosing purlins are installed on the inner sides of the steel pipe piles at the designed positions; s7, pressing supports are installed on the multiple steel casings along the boundary line of the excavation area; and S8, after bottom sealing concrete pouring is completed, the pulling and pressing supports are dismantled. The method has the beneficial effects that the situation that a welding mode is used for solving the pulling force problem, stress concentration is caused by large foundation pit deformation, and cofferdam instability is caused is avoided.
本发明公开了一种拉压支座轻型围堰施工方法,涉及基坑施工领域,技术方案为,包括以下步骤:S1、在施工区域内标定出基坑的开挖区域,并在开挖区域内预先埋入若干个钢护筒;S2、沿开挖区域的边界线走向埋入钢管桩;S3、基坑开挖,当挖到第二道支撑设计标高以下0.5m时,在钢管桩的外侧安装第一道围檩;S4、沿开挖区域边界线的若干个钢护筒上安装拉支座;S5、安装第二道支撑;S6、围堰开挖到压支座设计标高以下0.5m时,在设计位置钢管桩内侧安装围檩;S7、沿开挖区域边界线的若干个钢护筒上安装压支座;S8、待封底混凝土浇筑完成拆除拉、压支座。本发明的有益效果是:避免了使用焊接方式解决拉力问题,因基坑变形大,导致应力集中,造成围堰失稳。
Construction method of tension-compression support light cofferdam
The invention discloses a tension-compression support light cofferdam construction method, and relates to the field of foundation pit construction, and the technical scheme is that the construction method comprises the following steps: S1, an excavation area of a foundation pit is calibrated in a construction area, and a plurality of steel casings are pre-buried in the excavation area; s2, steel pipe piles are embedded in the trend of the boundary line of the excavation area; s3, a foundation pit is excavated, and when the position 0.5 m below the designed elevation of a second support is excavated, a first enclosing purlin is installed on the outer side of the steel pipe pile; s4, pull supports are installed on the multiple steel casings along the boundary line of the excavation area; s5, mounting a second support; s6, when the cofferdam is excavated to be 0.5 m below the designed elevation of the pressing support, enclosing purlins are installed on the inner sides of the steel pipe piles at the designed positions; s7, pressing supports are installed on the multiple steel casings along the boundary line of the excavation area; and S8, after bottom sealing concrete pouring is completed, the pulling and pressing supports are dismantled. The method has the beneficial effects that the situation that a welding mode is used for solving the pulling force problem, stress concentration is caused by large foundation pit deformation, and cofferdam instability is caused is avoided.
本发明公开了一种拉压支座轻型围堰施工方法,涉及基坑施工领域,技术方案为,包括以下步骤:S1、在施工区域内标定出基坑的开挖区域,并在开挖区域内预先埋入若干个钢护筒;S2、沿开挖区域的边界线走向埋入钢管桩;S3、基坑开挖,当挖到第二道支撑设计标高以下0.5m时,在钢管桩的外侧安装第一道围檩;S4、沿开挖区域边界线的若干个钢护筒上安装拉支座;S5、安装第二道支撑;S6、围堰开挖到压支座设计标高以下0.5m时,在设计位置钢管桩内侧安装围檩;S7、沿开挖区域边界线的若干个钢护筒上安装压支座;S8、待封底混凝土浇筑完成拆除拉、压支座。本发明的有益效果是:避免了使用焊接方式解决拉力问题,因基坑变形大,导致应力集中,造成围堰失稳。
Construction method of tension-compression support light cofferdam
一种拉压支座轻型围堰施工方法
LIU WEI (author) / HU FENG (author) / CUI YANJI (author) / YANG SHUAI (author) / LU KAI (author) / DUAN JIWEI (author) / YANG GUANGTING (author) / WEN XIAOKANG (author) / WANG MINMIN (author) / GAI ZHONG (author)
2023-04-18
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Adjustable cofferdam structure and cofferdam construction method
European Patent Office | 2023
|Cofferdam support mechanism and construction support foundation
European Patent Office | 2023
|Combined cofferdam and construction method of combined cofferdam
European Patent Office | 2023
|