Novel intensive construction process for prefabricated aqueduct
The invention discloses a novel intensive construction technology for a prefabricated aqueduct. The novel intensive construction technology comprises the following steps that a construction site is arranged; an outer mold assembly is assembled; binding reinforcing steel bars; assembling an inner mold assembly, a lifting support and a self-propelled hanging bracket; hoisting and adjusting the inner mold assembly in place, and mounting an end mold; concrete is poured into a cavity between the outer mold assembly and the inner mold assembly; and removing the end mold, and removing the left outer mold and the right outer mold. According to the construction method, the assembly line construction mode is sequentially set for the construction operation of the prefabricated aqueduct according to the construction sequence, and when the later working procedure is constructed, the former working procedure is always carried out, circularly propelled and intensively constructed, so that the construction efficiency is fully improved, workers in each working procedure only need to be responsible for the quality of the working procedure, and the construction cost is reduced. Therefore, the professional degree of workers is improved, the construction quality is greatly improved, and the production cost is also reduced.
本发明公开了一种预制渡槽新型集约化施工工艺,包括以下步骤:布置施工场地;组装外模总成;绑扎钢筋;组装内模总成、升降支座和自行吊架;吊装并调整内模总成到位,安装端模;向外模总成和内模总成之间的空腔内浇筑混凝土;拆除端模,再脱左侧外模和右侧外模。本发明将预制渡槽的施工作业按照施工的先后顺序依次设置了流水线的施工方式,在施工后面的工序时,前面的工序也一直在进行,循环式推进,集约化施工,这样就充分提高了施工效率,每道工序的工人只需负责该工序的质量即可,这样就提高了工人的专业度,大大提高了施工质量,也降低了生产成本。
Novel intensive construction process for prefabricated aqueduct
The invention discloses a novel intensive construction technology for a prefabricated aqueduct. The novel intensive construction technology comprises the following steps that a construction site is arranged; an outer mold assembly is assembled; binding reinforcing steel bars; assembling an inner mold assembly, a lifting support and a self-propelled hanging bracket; hoisting and adjusting the inner mold assembly in place, and mounting an end mold; concrete is poured into a cavity between the outer mold assembly and the inner mold assembly; and removing the end mold, and removing the left outer mold and the right outer mold. According to the construction method, the assembly line construction mode is sequentially set for the construction operation of the prefabricated aqueduct according to the construction sequence, and when the later working procedure is constructed, the former working procedure is always carried out, circularly propelled and intensively constructed, so that the construction efficiency is fully improved, workers in each working procedure only need to be responsible for the quality of the working procedure, and the construction cost is reduced. Therefore, the professional degree of workers is improved, the construction quality is greatly improved, and the production cost is also reduced.
本发明公开了一种预制渡槽新型集约化施工工艺,包括以下步骤:布置施工场地;组装外模总成;绑扎钢筋;组装内模总成、升降支座和自行吊架;吊装并调整内模总成到位,安装端模;向外模总成和内模总成之间的空腔内浇筑混凝土;拆除端模,再脱左侧外模和右侧外模。本发明将预制渡槽的施工作业按照施工的先后顺序依次设置了流水线的施工方式,在施工后面的工序时,前面的工序也一直在进行,循环式推进,集约化施工,这样就充分提高了施工效率,每道工序的工人只需负责该工序的质量即可,这样就提高了工人的专业度,大大提高了施工质量,也降低了生产成本。
Novel intensive construction process for prefabricated aqueduct
预制渡槽新型集约化施工工艺
CUI XIAOKANG (Autor:in) / ZHAO ZHIZHONG (Autor:in) / SONG JIANJUN (Autor:in) / ZHU YEKAI (Autor:in) / ZHANG XIANGFEI (Autor:in) / YUE CONGCONG (Autor:in)
09.05.2023
Patent
Elektronische Ressource
Chinesisch
Novel intensive efficient construction production line for prefabricated aqueduct
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Segmented prefabricated aqueduct and construction method thereof
Europäisches Patentamt | 2023
|Fabricated arched aqueduct support, aqueduct and construction method of aqueduct support
Europäisches Patentamt | 2024
|