Novel intensive efficient construction production line for prefabricated aqueduct
The novel intensive efficient construction production line comprises two longitudinal moving rails laid in the front-back direction, a plurality of sections of pouring pedestals are evenly arranged between the two longitudinal moving rails, the front end and the rear end of each section of pouring pedestal are each provided with a support base, and the left side and the rear side of each pouring pedestal are each provided with two transverse moving rails; an outer mold assembly is arranged on the forefront section of the pouring pedestal; lifting supports are arranged on the support foundation, an inner mold assembly is arranged in the outer mold assembly, the two ends of the inner mold assembly are supported on the lifting supports at the front end and the rear end of the pouring pedestal, and end molds are arranged at the front end and the rear end of the outer mold assembly. According to the construction method of the prefabricated aqueduct, the construction operation of the prefabricated aqueduct is set to be in an assembly line construction mode in sequence according to the construction sequence, when the subsequent working procedure is constructed, the previous working procedure is still carried out, circulating propelling and intensive construction are achieved, the professional degree of workers is higher, the construction quality is greatly improved, and the production cost is also reduced.
本发明公开了一种预制渡槽新型集约化高效施工生产线,包括沿前后方向铺设的两条纵移轨道,在两条纵移轨道之间均匀设置若干段浇筑台座,每段浇筑台座前后两端均设置支座基础,在浇筑台座左侧和后侧均设置两条横移轨道;最前部的一段浇筑台座上设有外模总成;支座基础上设有升降支座,外模总成内部设有内模总成,内模总成两端支撑在浇筑台座前后端的升降支座上,外模总成前端后端均设有端模。本发明将预制渡槽的施工作业按照施工的先后顺序依次设置了流水线的施工方式,在施工后面的工序时,前面的工序也一直在进行,循环式推进,集约化施工,工人的专业度更强,大大提高了施工质量,也降低了生产成本。
Novel intensive efficient construction production line for prefabricated aqueduct
The novel intensive efficient construction production line comprises two longitudinal moving rails laid in the front-back direction, a plurality of sections of pouring pedestals are evenly arranged between the two longitudinal moving rails, the front end and the rear end of each section of pouring pedestal are each provided with a support base, and the left side and the rear side of each pouring pedestal are each provided with two transverse moving rails; an outer mold assembly is arranged on the forefront section of the pouring pedestal; lifting supports are arranged on the support foundation, an inner mold assembly is arranged in the outer mold assembly, the two ends of the inner mold assembly are supported on the lifting supports at the front end and the rear end of the pouring pedestal, and end molds are arranged at the front end and the rear end of the outer mold assembly. According to the construction method of the prefabricated aqueduct, the construction operation of the prefabricated aqueduct is set to be in an assembly line construction mode in sequence according to the construction sequence, when the subsequent working procedure is constructed, the previous working procedure is still carried out, circulating propelling and intensive construction are achieved, the professional degree of workers is higher, the construction quality is greatly improved, and the production cost is also reduced.
本发明公开了一种预制渡槽新型集约化高效施工生产线,包括沿前后方向铺设的两条纵移轨道,在两条纵移轨道之间均匀设置若干段浇筑台座,每段浇筑台座前后两端均设置支座基础,在浇筑台座左侧和后侧均设置两条横移轨道;最前部的一段浇筑台座上设有外模总成;支座基础上设有升降支座,外模总成内部设有内模总成,内模总成两端支撑在浇筑台座前后端的升降支座上,外模总成前端后端均设有端模。本发明将预制渡槽的施工作业按照施工的先后顺序依次设置了流水线的施工方式,在施工后面的工序时,前面的工序也一直在进行,循环式推进,集约化施工,工人的专业度更强,大大提高了施工质量,也降低了生产成本。
Novel intensive efficient construction production line for prefabricated aqueduct
预制渡槽新型集约化高效施工生产线
CUI XIAOKANG (Autor:in) / ZHAO ZHIZHONG (Autor:in) / SONG JIANJUN (Autor:in) / ZHANG XIANGFEI (Autor:in) / ZHU YEKAI (Autor:in) / YUE CONGCONG (Autor:in)
06.06.2023
Patent
Elektronische Ressource
Chinesisch
Novel intensive construction process for prefabricated aqueduct
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Segmented prefabricated aqueduct and construction method thereof
Europäisches Patentamt | 2023
|Fabricated arched aqueduct support, aqueduct and construction method of aqueduct support
Europäisches Patentamt | 2024
|