Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Multi-layer foundation of wind turbine generator, construction method of multi-layer foundation and updating and replacing method of wind turbine generator
The multi-layer foundation construction method for the wind turbine generator is characterized in that according to the requirement for iterative updating of the wind turbine generator, multiple layers of foundation structures are sequentially constructed on the site selection of the wind turbine generator from inside to outside, the inner-layer foundation structure is used for bearing the current-generation wind turbine generator, and the outer-layer foundation structure is used for bearing the replaced new wind turbine generator. And at least one outer-layer foundation structure is constructed. According to the method, it is avoided that when the wind turbine generator needs to be iteratively updated, the foundation of the wind turbine generator is dismantled, and foundation excavation and pouring are conducted again, the foundation construction period of updating and replacing of the wind turbine generator is shortened, and the outer-layer foundation structure is prefabricated for updating and replacing of the wind turbine generator according to the bearing requirement for iteratively updating of the wind turbine generator; the construction amount during updating and replacing of the wind turbine generator is reduced, additional foundation sites do not need to be added, and the construction difficulty of updating and replacing of the wind turbine generator is reduced. The invention further provides a wind turbine generator multilayer foundation and a wind turbine generator updating and replacing method.
风电机组多层基础建设方法,其特征在于:根据风电机组叠代更新的需求,在风电机组选址上由内至外依次建设多层基础结构,内层基础结构用于承载当代风电机组,外层基础结构分别用于承载替换的新风电机组,至少建设一层外层基础结构。本发明避免在风电机组需要叠代更新时再拆除风电机组的基础并重新进行基础开挖与浇筑,缩短风电机组更新替换的基础建设周期,根据风电机组叠代更新的承载要求,为风电机组更新替换预制出外层基础结构,减少风电机组更新替换时的施工量,不需要另外需要增加基础场地,降低风电机组更新替换的施工难度。本发明还提供一种风电机组多层基础和风电机组更新替换方法。
Multi-layer foundation of wind turbine generator, construction method of multi-layer foundation and updating and replacing method of wind turbine generator
The multi-layer foundation construction method for the wind turbine generator is characterized in that according to the requirement for iterative updating of the wind turbine generator, multiple layers of foundation structures are sequentially constructed on the site selection of the wind turbine generator from inside to outside, the inner-layer foundation structure is used for bearing the current-generation wind turbine generator, and the outer-layer foundation structure is used for bearing the replaced new wind turbine generator. And at least one outer-layer foundation structure is constructed. According to the method, it is avoided that when the wind turbine generator needs to be iteratively updated, the foundation of the wind turbine generator is dismantled, and foundation excavation and pouring are conducted again, the foundation construction period of updating and replacing of the wind turbine generator is shortened, and the outer-layer foundation structure is prefabricated for updating and replacing of the wind turbine generator according to the bearing requirement for iteratively updating of the wind turbine generator; the construction amount during updating and replacing of the wind turbine generator is reduced, additional foundation sites do not need to be added, and the construction difficulty of updating and replacing of the wind turbine generator is reduced. The invention further provides a wind turbine generator multilayer foundation and a wind turbine generator updating and replacing method.
风电机组多层基础建设方法,其特征在于:根据风电机组叠代更新的需求,在风电机组选址上由内至外依次建设多层基础结构,内层基础结构用于承载当代风电机组,外层基础结构分别用于承载替换的新风电机组,至少建设一层外层基础结构。本发明避免在风电机组需要叠代更新时再拆除风电机组的基础并重新进行基础开挖与浇筑,缩短风电机组更新替换的基础建设周期,根据风电机组叠代更新的承载要求,为风电机组更新替换预制出外层基础结构,减少风电机组更新替换时的施工量,不需要另外需要增加基础场地,降低风电机组更新替换的施工难度。本发明还提供一种风电机组多层基础和风电机组更新替换方法。
Multi-layer foundation of wind turbine generator, construction method of multi-layer foundation and updating and replacing method of wind turbine generator
风电机组多层基础及其建设方法、风电机组更新替换方法
LYU SHUCHEN (Autor:in) / LI JUN (Autor:in) / YAN YONGYI (Autor:in) / LIU LU (Autor:in) / TANG XIAO (Autor:in) / SHENG JIE (Autor:in) / YANG JINGRUN (Autor:in) / YUAN QUAN (Autor:in) / SONG LIBING (Autor:in) / LIU TIEFEI (Autor:in)
09.05.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2020
|Reinforcing method for muddy soil layer foundation of wind turbine generator
Europäisches Patentamt | 2024
|Combined foundation for land wind turbine generator foundation
Europäisches Patentamt | 2023
|