Prefabricated segmented bent cap P anchor field installation method
The invention discloses a prefabricated segmented bent cap P anchor field installation method which comprises the steps that a first bearing platform, a second bearing platform and a third bearing platform are installed on the ground at equal intervals, and a first stand column is installed on the first bearing platform; the second stand column and the third stand column are installed at the two ends of the second bearing platform. The fourth stand column is installed on the third bearing platform. Comprising the steps that S1, a first support foundation and a second support foundation are constructed; s2, a first support base and a second support base are prefabricated; s3, a first support and a second support are installed; s4, a first sectional cover beam, a second sectional cover beam, a third sectional cover beam and a fourth sectional cover beam are installed; s5, corrugated pipes are installed in the first wet connection section, the second wet connection section and the third wet connection section; s6, a first anchor steel beam, a second anchor steel beam, a third anchor steel beam and a fourth anchor steel beam are installed; the on-site P anchor bundle penetrating process is simplified, and the P anchor steel bundle construction effect is improved.
本发明公开了一种预制分节盖梁P锚现场安装方法,地面上等距离安装第一承台、第二承台和第三承台,并将第一立柱安装在所述第一承台上;第二立柱和第三立柱安装在所述第二承台上两端;第四立柱安装在所述第三承台上;包括:步骤S1,第一支架地基和第二支架地基基础施工;步骤S2,预制第一支架基座和第二支架基座;步骤S3,安装第一支架和第二支架;步骤S4,安装第一分节盖梁、第二分节盖梁、第三分节盖梁和第四分节盖梁;步骤S5,在第一湿接段、第二湿接段和第三湿接段内安装波纹管;步骤S6,安装第一锚钢束、第二锚钢束、第三锚钢束和第四锚钢束;简化现场P锚穿束流程,提高P锚钢束施工效果。
Prefabricated segmented bent cap P anchor field installation method
The invention discloses a prefabricated segmented bent cap P anchor field installation method which comprises the steps that a first bearing platform, a second bearing platform and a third bearing platform are installed on the ground at equal intervals, and a first stand column is installed on the first bearing platform; the second stand column and the third stand column are installed at the two ends of the second bearing platform. The fourth stand column is installed on the third bearing platform. Comprising the steps that S1, a first support foundation and a second support foundation are constructed; s2, a first support base and a second support base are prefabricated; s3, a first support and a second support are installed; s4, a first sectional cover beam, a second sectional cover beam, a third sectional cover beam and a fourth sectional cover beam are installed; s5, corrugated pipes are installed in the first wet connection section, the second wet connection section and the third wet connection section; s6, a first anchor steel beam, a second anchor steel beam, a third anchor steel beam and a fourth anchor steel beam are installed; the on-site P anchor bundle penetrating process is simplified, and the P anchor steel bundle construction effect is improved.
本发明公开了一种预制分节盖梁P锚现场安装方法,地面上等距离安装第一承台、第二承台和第三承台,并将第一立柱安装在所述第一承台上;第二立柱和第三立柱安装在所述第二承台上两端;第四立柱安装在所述第三承台上;包括:步骤S1,第一支架地基和第二支架地基基础施工;步骤S2,预制第一支架基座和第二支架基座;步骤S3,安装第一支架和第二支架;步骤S4,安装第一分节盖梁、第二分节盖梁、第三分节盖梁和第四分节盖梁;步骤S5,在第一湿接段、第二湿接段和第三湿接段内安装波纹管;步骤S6,安装第一锚钢束、第二锚钢束、第三锚钢束和第四锚钢束;简化现场P锚穿束流程,提高P锚钢束施工效果。
Prefabricated segmented bent cap P anchor field installation method
一种预制分节盖梁P锚现场安装方法
YUAN KOUFENG (Autor:in) / XUE XIAOBIN (Autor:in) / WANG WEI (Autor:in) / LI JIANCHEN (Autor:in) / ZHANG ZHONGXIANG (Autor:in) / WEI DONG (Autor:in) / WANG XUESEN (Autor:in) / GU PINGPING (Autor:in) / WANG XIAOGANG (Autor:in) / BAN YAFEI (Autor:in)
16.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Prefabricated bent cap installation and construction method
Europäisches Patentamt | 2024
|Prefabricated bent cap prestress deep-buried anchor sleeve and mounting process thereof
Europäisches Patentamt | 2020
|Anti-floating anchor rod based on socket type segmented prefabricated grouting body
Europäisches Patentamt | 2024
|