Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Large underwater steel cylinder foundation for offshore wind power and construction method thereof
The invention relates to a large underwater steel cylinder foundation for offshore wind power and a construction method thereof, the steel cylinder foundation comprises a steel cylinder and a jacket, the bottom of the steel cylinder is provided with a tooth blade part convenient for rock embedding, the top of the inner wall of the steel cylinder is provided with a plug-in assembly and a pile leg used for fixing the bottom of the jacket, and a gap between the pile leg and the plug-in assembly is reinforced through grouting. The offshore wind turbine tower drum is fixed on the jacket; the construction method comprises the steps of steel cylinder manufacturing; transporting the steel cylinder; assembling a steel cylinder vibration sinking hammer group; steel cylinder pile sinking; foundation pile legs of the jacket are fixed; and steel cylinder riprap covering. The method effectively solves the problems of large rock-socketed depth, low construction efficiency, long open-sea operation time, high cost investment, more professional equipment investment and the like in traditional offshore wind power rock-socketed pile foundation construction.
本发明是一种海上风电用大型水下钢圆筒基础及其施工方法,钢圆筒基础包括钢圆筒、导管架,钢圆筒底部设有方便嵌岩的齿刃部,钢圆筒内壁顶部设有插接组件,用于固定导管架底部的桩腿,且桩腿和插接组件之间的缝隙通过注浆加固,海上风机塔筒固定在导管架上;施工方法包括钢圆筒制作;钢圆筒运输;钢圆筒振沉锤组组装;钢圆筒沉桩;导管架基础桩腿固定;钢圆筒抛石覆盖。本发明有效地解决了传统海上风电嵌岩桩基础施工的嵌岩深度大、施工效率低、外海作业时间长、成本投入大、专业设备投入较多等问题。
Large underwater steel cylinder foundation for offshore wind power and construction method thereof
The invention relates to a large underwater steel cylinder foundation for offshore wind power and a construction method thereof, the steel cylinder foundation comprises a steel cylinder and a jacket, the bottom of the steel cylinder is provided with a tooth blade part convenient for rock embedding, the top of the inner wall of the steel cylinder is provided with a plug-in assembly and a pile leg used for fixing the bottom of the jacket, and a gap between the pile leg and the plug-in assembly is reinforced through grouting. The offshore wind turbine tower drum is fixed on the jacket; the construction method comprises the steps of steel cylinder manufacturing; transporting the steel cylinder; assembling a steel cylinder vibration sinking hammer group; steel cylinder pile sinking; foundation pile legs of the jacket are fixed; and steel cylinder riprap covering. The method effectively solves the problems of large rock-socketed depth, low construction efficiency, long open-sea operation time, high cost investment, more professional equipment investment and the like in traditional offshore wind power rock-socketed pile foundation construction.
本发明是一种海上风电用大型水下钢圆筒基础及其施工方法,钢圆筒基础包括钢圆筒、导管架,钢圆筒底部设有方便嵌岩的齿刃部,钢圆筒内壁顶部设有插接组件,用于固定导管架底部的桩腿,且桩腿和插接组件之间的缝隙通过注浆加固,海上风机塔筒固定在导管架上;施工方法包括钢圆筒制作;钢圆筒运输;钢圆筒振沉锤组组装;钢圆筒沉桩;导管架基础桩腿固定;钢圆筒抛石覆盖。本发明有效地解决了传统海上风电嵌岩桩基础施工的嵌岩深度大、施工效率低、外海作业时间长、成本投入大、专业设备投入较多等问题。
Large underwater steel cylinder foundation for offshore wind power and construction method thereof
一种海上风电用大型水下钢圆筒基础及其施工方法
LIU MING (Autor:in) / YANG HELIN (Autor:in) / DOU YANJUN (Autor:in) / SU YIRU (Autor:in) / SOMMOUX (Autor:in) / XU LINLI (Autor:in) / SHEN JIAHAI (Autor:in) / SHI JULIN (Autor:in) / WANG AN (Autor:in)
14.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Offshore wind power multi-cylinder jacket foundation construction method
Europäisches Patentamt | 2021
|Novel offshore wind power all-steel cylinder foundation structure
Europäisches Patentamt | 2020
|Offshore wind power multi-cylinder jacket foundation construction method and workboat
Europäisches Patentamt | 2021
|Offshore wind power pile foundation and construction method thereof
Europäisches Patentamt | 2024
|