Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Four-pile jacket fan foundation structure and rapid manufacturing method thereof
The invention discloses a four-pile jacket fan foundation structure and a rapid manufacturing method thereof.The four-pile jacket fan foundation structure is reasonable in layout, horizontal machining is adopted, all parts are independently and synchronously prefabricated and then overall splicing is conducted, and before a jacket body is overall spliced, the whole jacket body can be assembled in a one-to-one mode; the prefabricated ship leaning component, the grouting system and other related accessory components are installed on the corresponding jacket body, before the transition section and the jacket body are assembled, the prefabricated inner platform and the prefabricated outer platform are installed on the transition section in advance and are assembled with the jacket body along with the transition section, through the manufacturing mode, the high-altitude operation work is greatly reduced, and the construction efficiency is improved. The labor intensity is reduced, the manufacturing speed of the jacket foundation is increased, the manufacturing period is shortened, and meanwhile, the product quality is easier to control.
本发明介绍了一种四桩导管架风机基础结构及其快速制作方法,四桩导管架风机基础结构,布局合理,采用卧式加工,各部件单独同步预制,然后再总体总拼,导管架本体总拼前,将预制好的船靠构件、灌浆系统等相关附属构件安装到相应导管架本体上,过渡段与导管架本体总拼前,提前将预制好的内、外平台安装在过渡段上,随过渡段一起与导管架本体总拼,通过此种制作模式,大大降低了的高空作业工作,降低了劳动强度,提高了导管架基础的制作速度,节约制作工期,同时使得产品质量也更容易控制。
Four-pile jacket fan foundation structure and rapid manufacturing method thereof
The invention discloses a four-pile jacket fan foundation structure and a rapid manufacturing method thereof.The four-pile jacket fan foundation structure is reasonable in layout, horizontal machining is adopted, all parts are independently and synchronously prefabricated and then overall splicing is conducted, and before a jacket body is overall spliced, the whole jacket body can be assembled in a one-to-one mode; the prefabricated ship leaning component, the grouting system and other related accessory components are installed on the corresponding jacket body, before the transition section and the jacket body are assembled, the prefabricated inner platform and the prefabricated outer platform are installed on the transition section in advance and are assembled with the jacket body along with the transition section, through the manufacturing mode, the high-altitude operation work is greatly reduced, and the construction efficiency is improved. The labor intensity is reduced, the manufacturing speed of the jacket foundation is increased, the manufacturing period is shortened, and meanwhile, the product quality is easier to control.
本发明介绍了一种四桩导管架风机基础结构及其快速制作方法,四桩导管架风机基础结构,布局合理,采用卧式加工,各部件单独同步预制,然后再总体总拼,导管架本体总拼前,将预制好的船靠构件、灌浆系统等相关附属构件安装到相应导管架本体上,过渡段与导管架本体总拼前,提前将预制好的内、外平台安装在过渡段上,随过渡段一起与导管架本体总拼,通过此种制作模式,大大降低了的高空作业工作,降低了劳动强度,提高了导管架基础的制作速度,节约制作工期,同时使得产品质量也更容易控制。
Four-pile jacket fan foundation structure and rapid manufacturing method thereof
一种四桩导管架风机基础结构及其快速制作方法
SHEN MINGMING (Autor:in) / CHEN SHICHAO (Autor:in) / ZHANG JIE (Autor:in) / TAO DINGXIN (Autor:in) / YANG DANDAN (Autor:in) / CHOI RANG-RANG (Autor:in) / WANG ZHIPING (Autor:in) / NIE ZHUANGZHUANG (Autor:in) / ZHAO CHAOHUI (Autor:in) / LYU ZHIHAO (Autor:in)
15.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
E06C
LADDERS
,
Leitern
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
Jacket swirling pile foundation structure and construction method thereof
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2023
|Offshore wind power underwater four-pile jacket foundation construction pile stabilizing platform
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Protective structure for erosion of jacket pile foundation
Europäisches Patentamt | 2023
|