Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Automatic construction method for main tower steel bars
The invention relates to an automatic construction method for main tower steel bars, and belongs to the technical field of bridge construction.The automatic construction method for the main tower steel bars comprises the steps that firstly, the main tower steel bars are hoisted into an inner cavity of a main tower, a stiff framework of the main tower is hoisted to the designated section position, and two vacancies are reserved in the stiff framework; then rotating cranes are installed on the top of the stiff framework, hoisting testing is conducted on the rotating cranes, the rotating cranes are provided with hoisting tools, the multiple rotating cranes are connected to a numerical control terminal, and automatic hoisting construction is controlled through the numerical control terminal; by means of the method, the occupation time of steel bar construction on large mechanical equipment can be shortened, the mechanical utilization rate is increased, and the construction mechanical cost is reduced.
本申请涉及一种主塔钢筋自动化施工的方法,属于桥梁建造技术领域,所述主塔钢筋自动化施工的方法,包括首先将主塔钢筋吊装至主塔内腔中,将主塔的劲性骨架吊装至指定节段位置,且劲性骨架预留有两处空缺,接着在劲性骨架的顶部安装旋转吊机,并对旋转吊机做吊装测试,旋转吊机安装吊具,并将若干个旋转吊机连接至数控终端,通过数控终端控制自动吊装施工;本申请可以通过本发明方法可减少钢筋施工对大型机械设备的占用时间,提高机械利用率,降低施工机械成本。
Automatic construction method for main tower steel bars
The invention relates to an automatic construction method for main tower steel bars, and belongs to the technical field of bridge construction.The automatic construction method for the main tower steel bars comprises the steps that firstly, the main tower steel bars are hoisted into an inner cavity of a main tower, a stiff framework of the main tower is hoisted to the designated section position, and two vacancies are reserved in the stiff framework; then rotating cranes are installed on the top of the stiff framework, hoisting testing is conducted on the rotating cranes, the rotating cranes are provided with hoisting tools, the multiple rotating cranes are connected to a numerical control terminal, and automatic hoisting construction is controlled through the numerical control terminal; by means of the method, the occupation time of steel bar construction on large mechanical equipment can be shortened, the mechanical utilization rate is increased, and the construction mechanical cost is reduced.
本申请涉及一种主塔钢筋自动化施工的方法,属于桥梁建造技术领域,所述主塔钢筋自动化施工的方法,包括首先将主塔钢筋吊装至主塔内腔中,将主塔的劲性骨架吊装至指定节段位置,且劲性骨架预留有两处空缺,接着在劲性骨架的顶部安装旋转吊机,并对旋转吊机做吊装测试,旋转吊机安装吊具,并将若干个旋转吊机连接至数控终端,通过数控终端控制自动吊装施工;本申请可以通过本发明方法可减少钢筋施工对大型机械设备的占用时间,提高机械利用率,降低施工机械成本。
Automatic construction method for main tower steel bars
一种主塔钢筋自动化施工的方法
SHE ZELING (Autor:in) / DING WENJUN (Autor:in) / ZHOU YUANXIN (Autor:in) / LIU LIN (Autor:in) / DING ZHAOZHI (Autor:in) / CHEN YIFAN (Autor:in) / JI SHUNPENG (Autor:in) / YANG MING (Autor:in) / CUI WEI (Autor:in)
05.09.2023
Patent
Elektronische Ressource
Chinesisch
Integral binding construction method for main tower steel bars
Europäisches Patentamt | 2024
|Quick positioning device for main reinforcing steel bars of cable bent tower
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|