Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Core tube and construction method thereof
The invention belongs to the technical field of steel structures, and particularly discloses a core tube and a construction method thereof. The connecting piece is arranged between the two steel reinforced columns, and the two ends of the connecting piece are connected with the two steel reinforced columns correspondingly, so that the mounting operation between the connecting piece and the steel reinforced columns is not affected by the mounting operation of the steel structure cylinder, namely, after the connecting piece and the steel reinforced columns are placed in the mounting cavity, the connecting piece and the steel reinforced columns are not connected with the steel structure cylinder; according to the core tube disclosed by the invention, after the installation operation of the steel structure tube body is completed, the installation operation between the connecting piece and the steel rib column is completed, so that the phenomenon of mutual cross operation occurring in the simultaneous installation process in the existing scheme is avoided, the phenomenon of low construction efficiency is further avoided, and the practicability of the core tube is effectively improved.
本发明属于钢结构技术领域,具体公开了一种核心筒及其施工方法。其中,通过使用连接件设置在两个钢骨柱之间、并且将连接件的两端分别与两个钢骨柱连接,使得连接件、钢骨柱之间的安装作业不受钢结构筒体的安装作业影响,即,连接件、钢骨柱放置在安装腔体内后,未与钢结构筒体构成连接关系,可以在钢结构筒体完成安装作业后,再完成连接件和钢骨柱之间的安装作业,避免现有方案中同时进行安装过程时出现的相互交叉作业的现象发生,进而避免施工效率降低的现象发生,有效地提升了核心筒的实用性。
Core tube and construction method thereof
The invention belongs to the technical field of steel structures, and particularly discloses a core tube and a construction method thereof. The connecting piece is arranged between the two steel reinforced columns, and the two ends of the connecting piece are connected with the two steel reinforced columns correspondingly, so that the mounting operation between the connecting piece and the steel reinforced columns is not affected by the mounting operation of the steel structure cylinder, namely, after the connecting piece and the steel reinforced columns are placed in the mounting cavity, the connecting piece and the steel reinforced columns are not connected with the steel structure cylinder; according to the core tube disclosed by the invention, after the installation operation of the steel structure tube body is completed, the installation operation between the connecting piece and the steel rib column is completed, so that the phenomenon of mutual cross operation occurring in the simultaneous installation process in the existing scheme is avoided, the phenomenon of low construction efficiency is further avoided, and the practicability of the core tube is effectively improved.
本发明属于钢结构技术领域,具体公开了一种核心筒及其施工方法。其中,通过使用连接件设置在两个钢骨柱之间、并且将连接件的两端分别与两个钢骨柱连接,使得连接件、钢骨柱之间的安装作业不受钢结构筒体的安装作业影响,即,连接件、钢骨柱放置在安装腔体内后,未与钢结构筒体构成连接关系,可以在钢结构筒体完成安装作业后,再完成连接件和钢骨柱之间的安装作业,避免现有方案中同时进行安装过程时出现的相互交叉作业的现象发生,进而避免施工效率降低的现象发生,有效地提升了核心筒的实用性。
Core tube and construction method thereof
一种核心筒及其施工方法
JIANG PANLIANG (Autor:in) / LIU XIN (Autor:in) / WANG JIANGXIN (Autor:in) / DENG DEYUAN (Autor:in) / WANG LI (Autor:in) / SUI XIAODONG (Autor:in) / WANG HUAN (Autor:in)
17.10.2023
Patent
Elektronische Ressource
Chinesisch
Core tube structure system and construction method thereof
Europäisches Patentamt | 2021
|Size-adjustable prefabricated core tube and construction method thereof
Europäisches Patentamt | 2020
|Semi-surrounded eccentric core tube and construction method thereof
Europäisches Patentamt | 2023
|