Construction method of underground structure pile-replacing-column internal partition wall
The invention discloses a construction method of an underground structure pile-replacing-column inner partition wall. The method comprises the four steps of a piling stage, a floor slab construction stage, a cleaning and connecting stage and a simulation and completion stage. According to the method, pipe pile sections with four spherical flanges are used for piling, and after piling is completed, negative first floor slab concrete is poured to support partition wall construction. The surface of the prestressed high-strength concrete pipe pile is cleaned to ensure connection with the fabricated partition wall block, the BIM technology is used for modeling to control and monitor the construction progress, and the fabricated partition wall block comprises a connecting clamp and a flange and can be connected with the spherical flanges on the four sides of the pipe pile. The method is suitable for construction of underground garages and underground commercial complexes, and has the advantages that the overall stability of component structures is improved, the installation period is shortened, and the construction efficiency is improved.
本发明公开了一种地下结构桩代柱内隔墙的施工方法。该方法包括四个步骤:打桩阶段、楼板施工阶段、清理和连接阶段以及模拟和完成阶段。在该方法中,使用带有四面球形法兰的管桩节进行打桩,并在打桩完成后浇筑负一层楼板混凝土以支撑隔墙施工。清理预应力高强混凝土管桩表面来确保与装配式隔墙块连接,并使用BIM技术建模来控制和监测施工进度,装配式隔墙块包括连接卡和法兰,能够与管桩四面球形法兰连接。该方法适用于地下车库和地下商业综合体的施工,并具有提高构件结构整体稳定性、缩短安装周期和提高施工效率的优点。
Construction method of underground structure pile-replacing-column internal partition wall
The invention discloses a construction method of an underground structure pile-replacing-column inner partition wall. The method comprises the four steps of a piling stage, a floor slab construction stage, a cleaning and connecting stage and a simulation and completion stage. According to the method, pipe pile sections with four spherical flanges are used for piling, and after piling is completed, negative first floor slab concrete is poured to support partition wall construction. The surface of the prestressed high-strength concrete pipe pile is cleaned to ensure connection with the fabricated partition wall block, the BIM technology is used for modeling to control and monitor the construction progress, and the fabricated partition wall block comprises a connecting clamp and a flange and can be connected with the spherical flanges on the four sides of the pipe pile. The method is suitable for construction of underground garages and underground commercial complexes, and has the advantages that the overall stability of component structures is improved, the installation period is shortened, and the construction efficiency is improved.
本发明公开了一种地下结构桩代柱内隔墙的施工方法。该方法包括四个步骤:打桩阶段、楼板施工阶段、清理和连接阶段以及模拟和完成阶段。在该方法中,使用带有四面球形法兰的管桩节进行打桩,并在打桩完成后浇筑负一层楼板混凝土以支撑隔墙施工。清理预应力高强混凝土管桩表面来确保与装配式隔墙块连接,并使用BIM技术建模来控制和监测施工进度,装配式隔墙块包括连接卡和法兰,能够与管桩四面球形法兰连接。该方法适用于地下车库和地下商业综合体的施工,并具有提高构件结构整体稳定性、缩短安装周期和提高施工效率的优点。
Construction method of underground structure pile-replacing-column internal partition wall
一种地下结构桩代柱内隔墙的施工方法
ZHANG NING (Autor:in) / JIANG FUSHENG (Autor:in) / LI HUANHUAN (Autor:in)
20.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Underground structure internal pile-replacing-column construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Construction method for replacing uplift pile with two-in-one underground diaphragm wall
Europäisches Patentamt | 2024
|CONSTRUCTION METHOD OF UNDERGROUND CONTINUOUS WALL AND PARTITION STRUCTURE
Europäisches Patentamt | 2017
|