Secondary pouring construction method for double-wall steel cofferdam
The invention relates to a secondary pouring construction method for a double-wall steel cofferdam. The secondary pouring construction method comprises the steps that a hoisting platform is built at the position of a pier; the first double-wall steel cofferdam is hoisted to a hoisting platform, and a first blade foot is welded to the first double-wall steel cofferdam; the first double-wall steel cofferdam is lowered, and the second double-wall steel cofferdam is welded to the first double-wall steel cofferdam; the two sections of double-wall steel cofferdams are lowered to a riverbed; water in the double-wall steel cofferdam is discharged, and a hoisting platform is built at the position of the next pier; after construction of the pier is completed, the double-wall steel cofferdam is cut, the second blade foot is welded to the bottom of the second double-wall steel cofferdam, and the second double-wall steel cofferdam is put down; the first double-wall steel cofferdam is divided into a pouring part and an inserting part, and the pouring part is welded to the second double-wall steel cofferdam; the pouring part and the second double-wall steel cofferdam are lowered to a riverbed; and the steps are repeated, and water-free environment construction is conducted on the other bridge pier positions. The double-wall steel cofferdam has the advantages that the number of the double-wall steel cofferdams needing to be used is reduced, and the bridge fabrication cost is reduced.
本申请涉及一种双壁钢围堰二次倒用施工方法,其包括:在桥墩位置处搭建吊装平台;将第一双壁钢围堰吊运至吊装平台,对第一双壁钢围堰焊接第一刃脚;将第一双壁钢围堰下放,将第二双壁钢围堰焊接于第一双壁钢围堰;将两节双壁钢围堰下放至河床;将双壁钢围堰内的水排出,并在下一桥墩位置处搭建吊装平台;当完成该桥墩的施工后,对双壁钢围堰进行切割,将第二刃脚焊接于第二双壁钢围堰底部,将第二双壁钢围堰下放;将第一双壁钢围堰分割为倒用部和插入部,将倒用部与第二双壁钢围堰焊接;将倒用部和第二双壁钢围堰下放至河床;重复以上步骤,在其余桥墩位置进行无水环境施工。本申请具有减少需要使用的双壁钢围堰数量,降低造桥成本的效果。
Secondary pouring construction method for double-wall steel cofferdam
The invention relates to a secondary pouring construction method for a double-wall steel cofferdam. The secondary pouring construction method comprises the steps that a hoisting platform is built at the position of a pier; the first double-wall steel cofferdam is hoisted to a hoisting platform, and a first blade foot is welded to the first double-wall steel cofferdam; the first double-wall steel cofferdam is lowered, and the second double-wall steel cofferdam is welded to the first double-wall steel cofferdam; the two sections of double-wall steel cofferdams are lowered to a riverbed; water in the double-wall steel cofferdam is discharged, and a hoisting platform is built at the position of the next pier; after construction of the pier is completed, the double-wall steel cofferdam is cut, the second blade foot is welded to the bottom of the second double-wall steel cofferdam, and the second double-wall steel cofferdam is put down; the first double-wall steel cofferdam is divided into a pouring part and an inserting part, and the pouring part is welded to the second double-wall steel cofferdam; the pouring part and the second double-wall steel cofferdam are lowered to a riverbed; and the steps are repeated, and water-free environment construction is conducted on the other bridge pier positions. The double-wall steel cofferdam has the advantages that the number of the double-wall steel cofferdams needing to be used is reduced, and the bridge fabrication cost is reduced.
本申请涉及一种双壁钢围堰二次倒用施工方法,其包括:在桥墩位置处搭建吊装平台;将第一双壁钢围堰吊运至吊装平台,对第一双壁钢围堰焊接第一刃脚;将第一双壁钢围堰下放,将第二双壁钢围堰焊接于第一双壁钢围堰;将两节双壁钢围堰下放至河床;将双壁钢围堰内的水排出,并在下一桥墩位置处搭建吊装平台;当完成该桥墩的施工后,对双壁钢围堰进行切割,将第二刃脚焊接于第二双壁钢围堰底部,将第二双壁钢围堰下放;将第一双壁钢围堰分割为倒用部和插入部,将倒用部与第二双壁钢围堰焊接;将倒用部和第二双壁钢围堰下放至河床;重复以上步骤,在其余桥墩位置进行无水环境施工。本申请具有减少需要使用的双壁钢围堰数量,降低造桥成本的效果。
Secondary pouring construction method for double-wall steel cofferdam
一种双壁钢围堰二次倒用施工方法
SUN JUN (Autor:in) / KWAK JONG-MOON (Autor:in) / WANG GUIYU (Autor:in) / MIAO MINGMING (Autor:in) / CHENG WENCAI (Autor:in) / ZHENG TONGHUI (Autor:in) / GAO JIUWANG (Autor:in) / YANG JINGXIN (Autor:in) / YU WEI (Autor:in) / WU ZHENLONG (Autor:in)
20.10.2023
Patent
Elektronische Ressource
Chinesisch
Double-wall steel cofferdam structure construction method and double-wall steel cofferdam structure
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Recyclable double-wall steel cofferdam and construction method thereof
Europäisches Patentamt | 2023
|