Thermal insulation construction method for lock chamber wall of large steel mould ship lock
The invention belongs to the technical field of ship lock chamber wall construction, particularly relates to a heat preservation construction method for a large steel mould ship lock chamber wall, and provides the following scheme for solving the problem that existing concrete filling is not sufficient: excavating equipment, water pumping equipment, soil filling equipment, flattening equipment, a curtain wall assembly and concrete pouring equipment are included, and the curtain wall assembly comprises earthwork; an outer heat preservation layer is arranged on the inner side of the earthwork, a concrete layer is arranged on the inner side of the outer heat preservation layer, a steel bar frame is arranged on the inner side of the concrete layer, an inner heat preservation layer is arranged on the inner side of the concrete layer, and a gate frame is arranged on the inner heat preservation layer. A concrete box is arranged on the mobile vehicle, a stirring mechanism is arranged in the concrete box, and the stirring mechanism comprises a motor, the filling degree of concrete can be improved, then the strength of the lock chamber wall can be improved, the stability is high, and the heat preservation effect is good.
本发明属于船闸闸室墙施工技术领域,尤其是一种大钢模船闸闸室墙保温施工方法,针对现有的混凝土填充不充实的问题,现提出如下方案,其包括挖掘设备、抽水设备、填土设备、压平设备、幕墙组件和混凝土浇筑设备,所述幕墙组件包括土方,所述土方的内侧设置有外保温层,所述外保温层的内侧设置有混凝土层,所述混凝土层的内侧设置有钢筋架,所述混凝土层内侧设置有内保温层,所述内保温层上设置有闸门架,所述混凝土浇筑设备保护移动车,所述移动车上设置有混凝土箱,所述混凝土箱内设置有搅拌机构,所述搅拌机构包括电机,本发明能够提高混凝土的充实度,进而能够提高闸室墙的强度,稳定性高,保温效果好。
Thermal insulation construction method for lock chamber wall of large steel mould ship lock
The invention belongs to the technical field of ship lock chamber wall construction, particularly relates to a heat preservation construction method for a large steel mould ship lock chamber wall, and provides the following scheme for solving the problem that existing concrete filling is not sufficient: excavating equipment, water pumping equipment, soil filling equipment, flattening equipment, a curtain wall assembly and concrete pouring equipment are included, and the curtain wall assembly comprises earthwork; an outer heat preservation layer is arranged on the inner side of the earthwork, a concrete layer is arranged on the inner side of the outer heat preservation layer, a steel bar frame is arranged on the inner side of the concrete layer, an inner heat preservation layer is arranged on the inner side of the concrete layer, and a gate frame is arranged on the inner heat preservation layer. A concrete box is arranged on the mobile vehicle, a stirring mechanism is arranged in the concrete box, and the stirring mechanism comprises a motor, the filling degree of concrete can be improved, then the strength of the lock chamber wall can be improved, the stability is high, and the heat preservation effect is good.
本发明属于船闸闸室墙施工技术领域,尤其是一种大钢模船闸闸室墙保温施工方法,针对现有的混凝土填充不充实的问题,现提出如下方案,其包括挖掘设备、抽水设备、填土设备、压平设备、幕墙组件和混凝土浇筑设备,所述幕墙组件包括土方,所述土方的内侧设置有外保温层,所述外保温层的内侧设置有混凝土层,所述混凝土层的内侧设置有钢筋架,所述混凝土层内侧设置有内保温层,所述内保温层上设置有闸门架,所述混凝土浇筑设备保护移动车,所述移动车上设置有混凝土箱,所述混凝土箱内设置有搅拌机构,所述搅拌机构包括电机,本发明能够提高混凝土的充实度,进而能够提高闸室墙的强度,稳定性高,保温效果好。
Thermal insulation construction method for lock chamber wall of large steel mould ship lock
一种大钢模船闸闸室墙保温施工方法
SHANG ZHIQING (Autor:in) / JI HENGJUN (Autor:in) / ZHOU FUJUN (Autor:in) / LU FENGHUA (Autor:in) / CHEN AIXIN (Autor:in)
21.11.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|Industrialized construction method for reinforcing mesh of lock chamber of ship lock
Europäisches Patentamt | 2024
|