Assembling method for overlapped assembly type underground station
The invention discloses a superposed assembly type underground station assembling method which comprises the following steps: S1, transporting side wall prefabricated parts to side wall mounting positions by transportation equipment, and then mounting side walls; s2, the transportation equipment returns along the original route and continues to transport the longitudinal beam prefabricated parts to the longitudinal beam mounting positions according to the planned route; s3, the transportation equipment returns along the original route and continues to transport the roof prefabricated parts to the position under the roof mounting position according to the planned route; s4, the transportation equipment returns along the original route, continues to transport the rail top air duct prefabricated parts to the position under the rail top air duct installation position according to the planned route, and then is jacked to the rail top air duct installation position for installation; and S5, after the steps S1-S4 are circulated in the longitudinal direction of the station to build the side walls, the longitudinal beams, the top plate and the rail top air ducts of the second-floor station, the steps S1-S4 are continuously repeated to build the first-floor station, and the method has the beneficial effects that the construction efficiency is improved, the construction difficulty is lowered, potential safety hazards are reduced, standardized operation is achieved, the design is ingenious, and the concept is novel.
本发明公开了一种叠合装配式地下车站拼装方法,包括以下步骤:步骤S1、运输设备将将侧墙预制构件运输至侧墙安装位置,然后安装侧墙;步骤S2、运输设备原路返回继续按计划路线运输纵梁预制构件至纵梁安装位置;步骤S3、运输设备原路返回继续按计划路线运输顶板预制构件至顶板安装位置的正下方;步骤S4、运输设备原路返回继续按计划路线运输轨顶风道预制构件至轨顶风道安装位置正下方,然后顶升至轨顶风道安装位置进行安装;步骤S5、沿车站纵向循环步骤S1‑S4修建完毕负二层车站的侧墙、纵梁及顶板及轨顶风道后,继续重复步骤S1‑S4修建负一层车站,具有提高施工效率、降低施工难度、减少安全隐患、实现标准化作业、设计精妙、构思新颖的特点。
Assembling method for overlapped assembly type underground station
The invention discloses a superposed assembly type underground station assembling method which comprises the following steps: S1, transporting side wall prefabricated parts to side wall mounting positions by transportation equipment, and then mounting side walls; s2, the transportation equipment returns along the original route and continues to transport the longitudinal beam prefabricated parts to the longitudinal beam mounting positions according to the planned route; s3, the transportation equipment returns along the original route and continues to transport the roof prefabricated parts to the position under the roof mounting position according to the planned route; s4, the transportation equipment returns along the original route, continues to transport the rail top air duct prefabricated parts to the position under the rail top air duct installation position according to the planned route, and then is jacked to the rail top air duct installation position for installation; and S5, after the steps S1-S4 are circulated in the longitudinal direction of the station to build the side walls, the longitudinal beams, the top plate and the rail top air ducts of the second-floor station, the steps S1-S4 are continuously repeated to build the first-floor station, and the method has the beneficial effects that the construction efficiency is improved, the construction difficulty is lowered, potential safety hazards are reduced, standardized operation is achieved, the design is ingenious, and the concept is novel.
本发明公开了一种叠合装配式地下车站拼装方法,包括以下步骤:步骤S1、运输设备将将侧墙预制构件运输至侧墙安装位置,然后安装侧墙;步骤S2、运输设备原路返回继续按计划路线运输纵梁预制构件至纵梁安装位置;步骤S3、运输设备原路返回继续按计划路线运输顶板预制构件至顶板安装位置的正下方;步骤S4、运输设备原路返回继续按计划路线运输轨顶风道预制构件至轨顶风道安装位置正下方,然后顶升至轨顶风道安装位置进行安装;步骤S5、沿车站纵向循环步骤S1‑S4修建完毕负二层车站的侧墙、纵梁及顶板及轨顶风道后,继续重复步骤S1‑S4修建负一层车站,具有提高施工效率、降低施工难度、减少安全隐患、实现标准化作业、设计精妙、构思新颖的特点。
Assembling method for overlapped assembly type underground station
一种叠合装配式地下车站拼装方法
XIAO FANGQI (Autor:in) / CUI GANG (Autor:in) / LIU FUPING (Autor:in) / XIE ZHONGWEN (Autor:in) / WEI JUNCHEN (Autor:in) / WANG MENG (Autor:in)
21.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Overlapped assembly type underground pipe gallery wallboard positioning device
Europäisches Patentamt | 2021
|Assembled and overlapped integral type underground station platform plate and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|