Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Assembled and overlapped integral type underground station platform plate and construction method
The invention relates to an assembled and overlapped integral type underground station platform plate and a construction method. The construction method comprises the following steps that channel steel sliding ways and station bottom limiting through holes in a station bottom plate are constructed; binding the door-type frame structure and a reinforcement cage of the middle supporting wall; manufacturing a standard platform plate and an inter-column platform plate; hoisting the prefabricated middle supporting wall, and arranging and mounting deviation rectifying devices on the two sides; the prefabricated door-type frame structure is installed in the channel steel sliding ways, and the prefabricated door-type frame structure is pushed to the installation position in cooperation with bottom pulleys; and the pouring channel steel slideway is fixed. The assembled and overlapped integral type underground station platform plate has the beneficial effects that by adopting the assembled and overlapped integral type underground station platform plate, all prefabricated parts can be quickly and efficiently assembled in the station construction process, so that the tedious steps and time of a traditional construction method are reduced, and the construction efficiency is improved; the invention further provides an installation deviation rectifying device, and positioning deviation rectifying can be conveniently carried out on the prefabricated middle supporting wall.
本发明涉及一种装配叠合整体式地下车站站台板及施工方法,包括以下步骤:施工车站底板上的槽钢滑道和站底限位通孔;绑扎门式框架结构和中间支承墙的钢筋笼;制作标准站台板和柱间站台板;吊装预制中间支承墙,两侧设置安装纠偏装置;将预制门式框架结构安装至槽钢滑道内,配合底部滑轮将预制门式框架结构推送至安装位置;灌注槽钢滑道固定。本发明的有益效果是:通过采用装配叠合整体式地下车站站台板,使得车站建设过程中各个预制构件能够快速、高效地组装,从而减少了传统施工方法的繁琐步骤和时间,提高了施工效率;并提出了一种安装纠偏装置,便于对预制中间支承墙进行定位纠偏。
Assembled and overlapped integral type underground station platform plate and construction method
The invention relates to an assembled and overlapped integral type underground station platform plate and a construction method. The construction method comprises the following steps that channel steel sliding ways and station bottom limiting through holes in a station bottom plate are constructed; binding the door-type frame structure and a reinforcement cage of the middle supporting wall; manufacturing a standard platform plate and an inter-column platform plate; hoisting the prefabricated middle supporting wall, and arranging and mounting deviation rectifying devices on the two sides; the prefabricated door-type frame structure is installed in the channel steel sliding ways, and the prefabricated door-type frame structure is pushed to the installation position in cooperation with bottom pulleys; and the pouring channel steel slideway is fixed. The assembled and overlapped integral type underground station platform plate has the beneficial effects that by adopting the assembled and overlapped integral type underground station platform plate, all prefabricated parts can be quickly and efficiently assembled in the station construction process, so that the tedious steps and time of a traditional construction method are reduced, and the construction efficiency is improved; the invention further provides an installation deviation rectifying device, and positioning deviation rectifying can be conveniently carried out on the prefabricated middle supporting wall.
本发明涉及一种装配叠合整体式地下车站站台板及施工方法,包括以下步骤:施工车站底板上的槽钢滑道和站底限位通孔;绑扎门式框架结构和中间支承墙的钢筋笼;制作标准站台板和柱间站台板;吊装预制中间支承墙,两侧设置安装纠偏装置;将预制门式框架结构安装至槽钢滑道内,配合底部滑轮将预制门式框架结构推送至安装位置;灌注槽钢滑道固定。本发明的有益效果是:通过采用装配叠合整体式地下车站站台板,使得车站建设过程中各个预制构件能够快速、高效地组装,从而减少了传统施工方法的繁琐步骤和时间,提高了施工效率;并提出了一种安装纠偏装置,便于对预制中间支承墙进行定位纠偏。
Assembled and overlapped integral type underground station platform plate and construction method
装配叠合整体式地下车站站台板及施工方法
CHEN PENG (Autor:in) / XIE ZHONGWEN (Autor:in) / XIAO FANGQI (Autor:in) / CUI GANG (Autor:in) / LIU SHUSEN (Autor:in) / LI PENG (Autor:in) / WANG HAIFENG (Autor:in) / WU JIANYONG (Autor:in)
05.07.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Assembling method for overlapped assembly type underground station
Europäisches Patentamt | 2023
|Assembled integral type underground structure and construction method
Europäisches Patentamt | 2024
|