Dampproof flood embankment lifting construction method
The moistureproof flood embankment lifting construction method comprises the steps that upgrading and reinforcing are conducted on an old gate, a seawall is filled and constructed, and the seawall comprises an embankment main body section, an embankment connecting section, an embankment transition section and an underpass bridge section; the two ends of a bridge or a sluice station penetrating through the embankment are each connected with an embankment connecting section, and the other end of each embankment connecting section is connected with an embankment transition section. The dike transition section is connected between the dike connecting section and the dike main body section; two ends of the underpass bridge section are directly connected with the dike main body section; the construction method comprises the following steps: firstly, upgrading and reinforcing an old gate; secondly, carrying out seawall filling construction, namely constructing a seawall dike main body section, a dike connecting section, a dike transition section and an underpass bridge section; and finally, the seawall pavement and ancillary facilities thereof are mainly constructed. And flood control and flood drainage safety in the enclosure are guaranteed.
本发明公开了一种防潮洪堤提升施工方法,包括对老闸提标加固,对海堤填筑施工,海堤包括堤防主体段、堤防连接段、堤防过渡段以及下穿桥梁段;穿堤的桥梁或水闸站两端各连接一个堤防连接段,堤防连接段另一端连接堤防过渡段;堤防过渡段连接在堤防连接段与堤防主体段之间;下穿桥梁段两端与堤防主体段直接相连;施工方法包括:首先,对老闸提标加固;其次,对海堤填筑施工,即对海堤堤防主体段、堤防连接段、堤防过渡段以及下穿桥梁段进行施工;最后,对海堤路面及其附属设施主要施工。保障了围内防洪潮、排涝安全。
Dampproof flood embankment lifting construction method
The moistureproof flood embankment lifting construction method comprises the steps that upgrading and reinforcing are conducted on an old gate, a seawall is filled and constructed, and the seawall comprises an embankment main body section, an embankment connecting section, an embankment transition section and an underpass bridge section; the two ends of a bridge or a sluice station penetrating through the embankment are each connected with an embankment connecting section, and the other end of each embankment connecting section is connected with an embankment transition section. The dike transition section is connected between the dike connecting section and the dike main body section; two ends of the underpass bridge section are directly connected with the dike main body section; the construction method comprises the following steps: firstly, upgrading and reinforcing an old gate; secondly, carrying out seawall filling construction, namely constructing a seawall dike main body section, a dike connecting section, a dike transition section and an underpass bridge section; and finally, the seawall pavement and ancillary facilities thereof are mainly constructed. And flood control and flood drainage safety in the enclosure are guaranteed.
本发明公开了一种防潮洪堤提升施工方法,包括对老闸提标加固,对海堤填筑施工,海堤包括堤防主体段、堤防连接段、堤防过渡段以及下穿桥梁段;穿堤的桥梁或水闸站两端各连接一个堤防连接段,堤防连接段另一端连接堤防过渡段;堤防过渡段连接在堤防连接段与堤防主体段之间;下穿桥梁段两端与堤防主体段直接相连;施工方法包括:首先,对老闸提标加固;其次,对海堤填筑施工,即对海堤堤防主体段、堤防连接段、堤防过渡段以及下穿桥梁段进行施工;最后,对海堤路面及其附属设施主要施工。保障了围内防洪潮、排涝安全。
Dampproof flood embankment lifting construction method
一种防潮洪堤提升施工方法
WU SONGHUA (Autor:in) / LIU YUFEI (Autor:in) / ZHANG CHAOYANG (Autor:in) / MA JIBO (Autor:in) / LIU ZHUANG (Autor:in) / GUO XIANGYIN (Autor:in) / WU WENHAO (Autor:in) / WANG YUE (Autor:in) / ZHENG TONG (Autor:in) / WEI XUN (Autor:in)
08.12.2023
Patent
Elektronische Ressource
Chinesisch
Waterproof and dampproof lifting and transverse moving parking equipment
Europäisches Patentamt | 2021
|Dampproof Measure of Indoor Ground
British Library Online Contents | 1998
|