Technical process for assembling building by adopting inorganic plates
The invention relates to a technical process for assembling a building by adopting inorganic plates. The technical process comprises the following steps: S1, completing foundation construction of the building; s2, steel bars at the bearing structure are inserted into the foundation according to the design drawing; s3, the bearing structure is connected with the inner wall plates and the outer wall plates at the corners through connecting pieces, and a closed box body is formed and inserted into a foundation; s4, slurry is injected into the box body formed in the step S3 to reach a specified height; s5, the inner wall plates and the outer wall plates at the non-bearing structure and the door and window are connected through connecting pieces, and a closed box body is formed and inserted into the foundation; s6, non-bearing slurry is injected into the box body formed in the step S5 to reach the specified height; s7, ring beam steel bars, inner beam steel bars and column steel bars are installed, inner beams and column plates are assembled through connecting pieces, and a box body is formed; s8, slurry is injected into the box body formed in the step S7 to reach the specified height; s9, a top plate is laid on the beam columns, and the structural face of the top plate faces upwards; and S10, reinforcing steel bars are installed on the top plate, and slurry is poured.
本发明涉及一种采用无机板材拼装建筑的技术工艺,其流程如下:S1:完成建筑的基础施工;S2:根据设计图纸将承重结构处的钢筋插至基础上;S3:通过连接件将承重结构和转角处的内墙板和外墙板连接,形成封闭的箱体并插至基础上;S4:向S3中形成的箱体内部注入浆体至指定高度;S5:通过连接件将非承重结构和门窗处的内墙板和外墙板连接,形成封闭的箱体并插至基础上;S6:向S5中形成的箱体内部注入非承重浆体至指定高度;S7:安装圈梁钢筋、内梁钢筋和柱钢筋,利用连接件拼装内梁和柱板,形成箱体;S8:向S7中形成的箱体内部注入浆体至指定高度;S9:在梁柱的上方铺设顶板,顶板的结构面向上;S10:在顶板上安装钢筋,并浇筑浆体。
Technical process for assembling building by adopting inorganic plates
The invention relates to a technical process for assembling a building by adopting inorganic plates. The technical process comprises the following steps: S1, completing foundation construction of the building; s2, steel bars at the bearing structure are inserted into the foundation according to the design drawing; s3, the bearing structure is connected with the inner wall plates and the outer wall plates at the corners through connecting pieces, and a closed box body is formed and inserted into a foundation; s4, slurry is injected into the box body formed in the step S3 to reach a specified height; s5, the inner wall plates and the outer wall plates at the non-bearing structure and the door and window are connected through connecting pieces, and a closed box body is formed and inserted into the foundation; s6, non-bearing slurry is injected into the box body formed in the step S5 to reach the specified height; s7, ring beam steel bars, inner beam steel bars and column steel bars are installed, inner beams and column plates are assembled through connecting pieces, and a box body is formed; s8, slurry is injected into the box body formed in the step S7 to reach the specified height; s9, a top plate is laid on the beam columns, and the structural face of the top plate faces upwards; and S10, reinforcing steel bars are installed on the top plate, and slurry is poured.
本发明涉及一种采用无机板材拼装建筑的技术工艺,其流程如下:S1:完成建筑的基础施工;S2:根据设计图纸将承重结构处的钢筋插至基础上;S3:通过连接件将承重结构和转角处的内墙板和外墙板连接,形成封闭的箱体并插至基础上;S4:向S3中形成的箱体内部注入浆体至指定高度;S5:通过连接件将非承重结构和门窗处的内墙板和外墙板连接,形成封闭的箱体并插至基础上;S6:向S5中形成的箱体内部注入非承重浆体至指定高度;S7:安装圈梁钢筋、内梁钢筋和柱钢筋,利用连接件拼装内梁和柱板,形成箱体;S8:向S7中形成的箱体内部注入浆体至指定高度;S9:在梁柱的上方铺设顶板,顶板的结构面向上;S10:在顶板上安装钢筋,并浇筑浆体。
Technical process for assembling building by adopting inorganic plates
一种采用无机板材拼装建筑的技术工艺
YANG JINFANG (Autor:in) / GONG WEI (Autor:in) / LI BIN (Autor:in) / QUAN WEI (Autor:in)
12.01.2024
Patent
Elektronische Ressource
Chinesisch
Hoisting construction method for building adopting modular explosion venting plates
Europäisches Patentamt | 2024
|High-speed assembling machine adopting intelligent chip feeding
Europäisches Patentamt | 2022
|Process for assembling glass cabinet door by adopting foam double sided tape
Europäisches Patentamt | 2020