Early-dismantling construction method for aluminum alloy formwork at attached support of attached scaffold
The invention discloses an early-dismantling construction method for an aluminum alloy formwork at an attached support of an attached scaffold, which comprises the following steps: preparing materials including a spare climbing frame support and a climbing frame extension guide rail, and matching the climbing frame extension guide rail with the spare climbing frame support; aluminum alloy formwork division construction is conducted on the attachment points of the standby climbing frame support according to the construction positions, aluminum alloy formworks of the attachment points of the standby climbing frame support are convenient to demount early, and the construction environment comprises the shear wall position, the window position, the corridor position, the balcony position, the stair position and the bay window position; the aluminum alloy formwork at the attachment point of the standby climbing frame support is dismantled, the standby climbing frame support is installed, the standby climbing frame support is located over the original climbing frame support, and the interval between the standby climbing frame support and the original climbing frame support needs to meet the construction requirement; and the climbing frame extension guide rail and the original climbing frame support are installed, after installation is completed, allowance is reserved on the climbing frame extension guide rail, and the allowance part of the climbing frame extension guide rail can be engaged with the standby climbing frame support.
本发明公开一种附着式脚手架附着支座处铝合金模板早拆施工方法,包括以下步骤:材料准备,材料包括备用爬架支座和爬架延长导轨,爬架延长导轨与备用爬架支座匹配;根据施工位置对备用爬架支座的附着点进行铝合金模板划分施工,方便备用爬架支座附着点的铝合金模板早拆,施工环境包括剪力墙位置、窗口位置、连廊位置、阳台位置、楼梯位置和凸窗位置;拆除备用爬架支座附着点的铝合金模板,安装备用爬架支座,备用爬架支座处于原爬架支座正上方,备用爬架支座与原爬架支座的间隔应满足施工要求;将爬架延长导轨与原爬架支座进行安装,安装完毕后爬架延长导轨留有余量,爬架延长导轨的余量部分能够与备用爬架支座咬合。
Early-dismantling construction method for aluminum alloy formwork at attached support of attached scaffold
The invention discloses an early-dismantling construction method for an aluminum alloy formwork at an attached support of an attached scaffold, which comprises the following steps: preparing materials including a spare climbing frame support and a climbing frame extension guide rail, and matching the climbing frame extension guide rail with the spare climbing frame support; aluminum alloy formwork division construction is conducted on the attachment points of the standby climbing frame support according to the construction positions, aluminum alloy formworks of the attachment points of the standby climbing frame support are convenient to demount early, and the construction environment comprises the shear wall position, the window position, the corridor position, the balcony position, the stair position and the bay window position; the aluminum alloy formwork at the attachment point of the standby climbing frame support is dismantled, the standby climbing frame support is installed, the standby climbing frame support is located over the original climbing frame support, and the interval between the standby climbing frame support and the original climbing frame support needs to meet the construction requirement; and the climbing frame extension guide rail and the original climbing frame support are installed, after installation is completed, allowance is reserved on the climbing frame extension guide rail, and the allowance part of the climbing frame extension guide rail can be engaged with the standby climbing frame support.
本发明公开一种附着式脚手架附着支座处铝合金模板早拆施工方法,包括以下步骤:材料准备,材料包括备用爬架支座和爬架延长导轨,爬架延长导轨与备用爬架支座匹配;根据施工位置对备用爬架支座的附着点进行铝合金模板划分施工,方便备用爬架支座附着点的铝合金模板早拆,施工环境包括剪力墙位置、窗口位置、连廊位置、阳台位置、楼梯位置和凸窗位置;拆除备用爬架支座附着点的铝合金模板,安装备用爬架支座,备用爬架支座处于原爬架支座正上方,备用爬架支座与原爬架支座的间隔应满足施工要求;将爬架延长导轨与原爬架支座进行安装,安装完毕后爬架延长导轨留有余量,爬架延长导轨的余量部分能够与备用爬架支座咬合。
Early-dismantling construction method for aluminum alloy formwork at attached support of attached scaffold
一种附着式脚手架附着支座处铝合金模板早拆施工方法
LI JIANXIN (Autor:in) / XIN QI (Autor:in) / HAN YOUQIANG (Autor:in) / CHEN XIAOHAN (Autor:in) / SHI XIAOMING (Autor:in) / XIN ZHAOYANG (Autor:in) / MO ZHENLIANG (Autor:in) / CHEN CONGYONG (Autor:in) / JIANG YUNFEI (Autor:in) / CHEN HAO (Autor:in)
19.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2023
|Concrete cylinder annular formwork-attached scaffold and construction method thereof
Europäisches Patentamt | 2015
|Aluminum alloy beam bottom formwork early-dismantling fulcrum structure and construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|