High suspended decorative beam cast-in-place-to-prefabrication integrated mounting structure and construction method
The invention provides a cast-in-place to prefabrication integrated mounting structure for a high-suspension decorative beam and a construction method.The cast-in-place to prefabrication integrated mounting structure comprises a pair of cast-in-place beams, prefabricated beam support wall columns are poured at the ends of the cast-in-place beams, a prefabricated beam is mounted between the prefabricated beam support wall columns, and partial integrated steel plates are embedded in the two ends of the prefabricated beam; the exposed part of the integrated steel plate is embedded in a core area of the prefabricated beam support wall column, supporting assemblies used for supporting the prefabricated beam and preventing overturning are installed on the prefabricated beam support wall column, and round head hanging nails are further embedded in the tops of the two ends of the prefabricated beam. According to the integrated decorative beam, on the premise that the hoisting capacity of a tower crane on site meets the requirement, the method of integral prefabrication, decoration integration and one-time hoisting is adopted for construction, the efficiency of existing equipment on site can be brought into full play, the construction quality and the construction progress are improved, erecting of an aerial work platform can be avoided, aerial work is reduced, and construction safety is guaranteed; the construction period and the cost are saved.
本发明提供一种高悬空装饰梁现浇转预制一体化安装结构及施工方法,包括一对现浇梁,一对所述现浇梁的端部均浇筑有预制梁支座墙柱,所述预制梁支座墙柱之间安装有预制梁,所述预制梁的两端均埋入有部分一体化钢板,所述一体化钢板的外露部分埋入预制梁支座墙柱的核心区内,所述预制梁支座墙柱上均安装有用于支撑预制梁和防倾覆的支撑组件,所述预制梁的两端顶部还埋入有圆头吊钉。该一体化装饰梁在现场塔吊起重能力满足要求的前提下,采用整体预制、装饰一体化、一次吊装的方法进行施工,能够充分发挥现场现有设备的效能,提高施工质量和施工进度,又可避免搭设高空作业平台,减少高空作业,保证施工安全,节约工期、节约成本。
High suspended decorative beam cast-in-place-to-prefabrication integrated mounting structure and construction method
The invention provides a cast-in-place to prefabrication integrated mounting structure for a high-suspension decorative beam and a construction method.The cast-in-place to prefabrication integrated mounting structure comprises a pair of cast-in-place beams, prefabricated beam support wall columns are poured at the ends of the cast-in-place beams, a prefabricated beam is mounted between the prefabricated beam support wall columns, and partial integrated steel plates are embedded in the two ends of the prefabricated beam; the exposed part of the integrated steel plate is embedded in a core area of the prefabricated beam support wall column, supporting assemblies used for supporting the prefabricated beam and preventing overturning are installed on the prefabricated beam support wall column, and round head hanging nails are further embedded in the tops of the two ends of the prefabricated beam. According to the integrated decorative beam, on the premise that the hoisting capacity of a tower crane on site meets the requirement, the method of integral prefabrication, decoration integration and one-time hoisting is adopted for construction, the efficiency of existing equipment on site can be brought into full play, the construction quality and the construction progress are improved, erecting of an aerial work platform can be avoided, aerial work is reduced, and construction safety is guaranteed; the construction period and the cost are saved.
本发明提供一种高悬空装饰梁现浇转预制一体化安装结构及施工方法,包括一对现浇梁,一对所述现浇梁的端部均浇筑有预制梁支座墙柱,所述预制梁支座墙柱之间安装有预制梁,所述预制梁的两端均埋入有部分一体化钢板,所述一体化钢板的外露部分埋入预制梁支座墙柱的核心区内,所述预制梁支座墙柱上均安装有用于支撑预制梁和防倾覆的支撑组件,所述预制梁的两端顶部还埋入有圆头吊钉。该一体化装饰梁在现场塔吊起重能力满足要求的前提下,采用整体预制、装饰一体化、一次吊装的方法进行施工,能够充分发挥现场现有设备的效能,提高施工质量和施工进度,又可避免搭设高空作业平台,减少高空作业,保证施工安全,节约工期、节约成本。
High suspended decorative beam cast-in-place-to-prefabrication integrated mounting structure and construction method
一种高悬空装饰梁现浇转预制一体化安装结构及施工方法
ZHANG QI (Autor:in) / ZHANG JINGBO (Autor:in) / SUN MAO (Autor:in) / QIN XUEFENG (Autor:in) / ZHANG LEZHENG (Autor:in) / WANG GUANGYONG (Autor:in)
23.01.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2020
|Mounting structure and mounting method for high-rise lobby decorative suspended ceiling
Europäisches Patentamt | 2025
|Bridge substructure prefabrication mounting device and construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|