Construction process of building penetrating through dry ditch downwards
The invention discloses a building construction process for underneath passing through a dry ditch, which relates to the field of pipeline construction and comprises the following steps: step 1, preparation work: determining a construction range and cleaning a surface; 2, earth excavation, including excavation under general conditions, excavation under special conditions and dewatering and drainage construction; thirdly, pipeline construction is conducted, and pipelines are laid according to construction requirements; and 4, groove backfilling is conducted, specifically, the grooves are backfilled with original soil. According to the construction technology of the underneath pass dry ditch building, original pipelines are protected through construction preparation, a construction site is repaired through the step of ditch backfilling, the original ecological environment is guaranteed to the maximum extent, the technological process is simple and convenient, adaptability is high, and the construction technology is suitable for underneath pass pipelines possibly encountered in the construction process. And corresponding measures are designed for the conditions of overhigh underground water level and water accumulation in the groove, so that smooth construction is ensured.
本发明公开了一种下穿干沟建筑施工工艺,涉及管道施工领域,包括步骤一、准备工作,确定施工的范围并进行清表;步骤二、土方开挖,包括一般情况下开挖、特殊情况下开挖和降排水施工;步骤三、管道施工,按照施工要求铺设管道;步骤四、沟槽回填,使用原有的土壤对沟槽进行回填。本发明提供了一种下穿干沟建筑施工工艺,通过施工准备对原有管线进行了保护,通过沟槽回填的步骤对施工场地进行了修复,以最大程度的保证了原有的生态环境,本工艺流程简便,适应性强,对施工过程中可能遇到的下穿管线,地下水位过高和沟槽积水的情况,都设计了应对措施,保证了施工顺利进行。
Construction process of building penetrating through dry ditch downwards
The invention discloses a building construction process for underneath passing through a dry ditch, which relates to the field of pipeline construction and comprises the following steps: step 1, preparation work: determining a construction range and cleaning a surface; 2, earth excavation, including excavation under general conditions, excavation under special conditions and dewatering and drainage construction; thirdly, pipeline construction is conducted, and pipelines are laid according to construction requirements; and 4, groove backfilling is conducted, specifically, the grooves are backfilled with original soil. According to the construction technology of the underneath pass dry ditch building, original pipelines are protected through construction preparation, a construction site is repaired through the step of ditch backfilling, the original ecological environment is guaranteed to the maximum extent, the technological process is simple and convenient, adaptability is high, and the construction technology is suitable for underneath pass pipelines possibly encountered in the construction process. And corresponding measures are designed for the conditions of overhigh underground water level and water accumulation in the groove, so that smooth construction is ensured.
本发明公开了一种下穿干沟建筑施工工艺,涉及管道施工领域,包括步骤一、准备工作,确定施工的范围并进行清表;步骤二、土方开挖,包括一般情况下开挖、特殊情况下开挖和降排水施工;步骤三、管道施工,按照施工要求铺设管道;步骤四、沟槽回填,使用原有的土壤对沟槽进行回填。本发明提供了一种下穿干沟建筑施工工艺,通过施工准备对原有管线进行了保护,通过沟槽回填的步骤对施工场地进行了修复,以最大程度的保证了原有的生态环境,本工艺流程简便,适应性强,对施工过程中可能遇到的下穿管线,地下水位过高和沟槽积水的情况,都设计了应对措施,保证了施工顺利进行。
Construction process of building penetrating through dry ditch downwards
下穿干沟建筑施工工艺
ZHOU DONGLIN (Autor:in) / JIANG ZONGZHENG (Autor:in) / MA HUANHONG (Autor:in) / HAN BAOWEI (Autor:in) / HU YONGGANG (Autor:in) / CHEN BEN (Autor:in) / SHI YONGPAN (Autor:in) / ZENG LINGPENG (Autor:in)
20.02.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|