Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Waterproof coiled material structure and construction technology
The invention relates to the field of building roof waterproofing, in particular to a waterproof roll structure and a construction technology, and the construction technology comprises the following steps: S1, cleaning sundries on a building roof, filling existing gaps, and ensuring that the building roof is dry; s2, laying a first waterproof coiled material and a second waterproof coiled material; the step S2 comprises the following steps: S21, laying the first waterproof coiled material; s22, acrylate sealant is arranged on the edge of the first waterproof roll; s23, a second waterproof coiled material is laid between every two adjacent first waterproof coiled materials; and S3, the edge of the first waterproof coiled material and the edge of the second waterproof coiled material are bonded and matched with the acrylate sealant. The method has the advantage that the waterproof effect of the building roof is guaranteed on the premise that economy is guaranteed.
本申请涉及建筑屋顶防水领域,尤其涉及一种防水卷材结构及施工工艺,其包括以下步骤:S1、清理建筑屋顶的杂物,填充已有缝隙,确保建筑屋顶干燥;S2、铺设第一防水卷材和第二防水卷材;所述S2步骤包括以下步骤:S21、铺设所述第一防水卷材;S22、在所述第一防水卷材的边缘布设丙烯酸盐密封胶;S23、在两相邻所述第一防水卷材之间铺设第二防水卷材;S3、使所述第一防水卷材的边缘和第二防水卷材的边缘均粘接配合于丙烯酸盐密封胶。本申请具有在保证经济性的前提下,确保建筑屋顶的防水效果的效果。
Waterproof coiled material structure and construction technology
The invention relates to the field of building roof waterproofing, in particular to a waterproof roll structure and a construction technology, and the construction technology comprises the following steps: S1, cleaning sundries on a building roof, filling existing gaps, and ensuring that the building roof is dry; s2, laying a first waterproof coiled material and a second waterproof coiled material; the step S2 comprises the following steps: S21, laying the first waterproof coiled material; s22, acrylate sealant is arranged on the edge of the first waterproof roll; s23, a second waterproof coiled material is laid between every two adjacent first waterproof coiled materials; and S3, the edge of the first waterproof coiled material and the edge of the second waterproof coiled material are bonded and matched with the acrylate sealant. The method has the advantage that the waterproof effect of the building roof is guaranteed on the premise that economy is guaranteed.
本申请涉及建筑屋顶防水领域,尤其涉及一种防水卷材结构及施工工艺,其包括以下步骤:S1、清理建筑屋顶的杂物,填充已有缝隙,确保建筑屋顶干燥;S2、铺设第一防水卷材和第二防水卷材;所述S2步骤包括以下步骤:S21、铺设所述第一防水卷材;S22、在所述第一防水卷材的边缘布设丙烯酸盐密封胶;S23、在两相邻所述第一防水卷材之间铺设第二防水卷材;S3、使所述第一防水卷材的边缘和第二防水卷材的边缘均粘接配合于丙烯酸盐密封胶。本申请具有在保证经济性的前提下,确保建筑屋顶的防水效果的效果。
Waterproof coiled material structure and construction technology
一种防水卷材结构及施工工艺
WU JIANMING (Autor:in) / ZHANG YUSHAO (Autor:in) / CHEN WENBO (Autor:in) / HUANG CHUIGUO (Autor:in)
20.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Europäisches Patentamt | 2021
|Waterproof coiled material and construction technology thereof
Europäisches Patentamt | 2020
|Double-waterproof-layer waterproof coiled material and construction technology thereof
Europäisches Patentamt | 2023
|Double-waterproof-layer waterproof coiled material and construction technology thereof
Europäisches Patentamt | 2023
|