Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction method for installing construction hoist on cantilever structure
The invention belongs to the technical field of buildings, and particularly relates to a design and construction method for installing a construction hoist on a cantilever structure. The method comprises the steps of elevator foundation design, cantilever structure bearing capacity re-checking calculation, elevator foundation construction and elevator installation. Through checking calculation of the bearing capacity of the frame beam of the cantilever structure under the load effect of the elevator, the construction and structure safety of the elevator is guaranteed. Reinforcing bars are constructed according to the checking calculation reinforcing bar area of the frame beam before construction of the cantilever structure, and the construction technical problem that the unloading support is arranged at the bottom of the frame beam of the cantilever structure to affect the next working procedure is solved. By installing the construction hoist on the cantilever structure, the problem that the construction site does not meet the installation space and position requirements of the hoist is solved, safety and reliability are achieved, labor cost and the construction period are greatly saved, and economic and social benefits are remarkable.
本发明属于建筑技术领域,具体为一种悬挑结构上安装施工升降机设计与施工方法。本发明包括:升降机基础设计、悬挑结构承载力复核计算、升降机基础施工、升降机安装。本发明通过升降机荷载作用下的悬挑结构的框架梁承载力验算,保障了升降机施工与结构安全。通过在悬挑结构施工前按照框架梁验算配筋面积施工配筋,解决了悬挑结构的框架梁底设置卸载支撑影响下道工序的施工技术难题。通过在悬挑结构上安装施工升降机,解决了施工现场不满足升降机安装空间及位置要求,安全可靠,大幅度节约人工费及工期,经济与社会效益显著。
Design and construction method for installing construction hoist on cantilever structure
The invention belongs to the technical field of buildings, and particularly relates to a design and construction method for installing a construction hoist on a cantilever structure. The method comprises the steps of elevator foundation design, cantilever structure bearing capacity re-checking calculation, elevator foundation construction and elevator installation. Through checking calculation of the bearing capacity of the frame beam of the cantilever structure under the load effect of the elevator, the construction and structure safety of the elevator is guaranteed. Reinforcing bars are constructed according to the checking calculation reinforcing bar area of the frame beam before construction of the cantilever structure, and the construction technical problem that the unloading support is arranged at the bottom of the frame beam of the cantilever structure to affect the next working procedure is solved. By installing the construction hoist on the cantilever structure, the problem that the construction site does not meet the installation space and position requirements of the hoist is solved, safety and reliability are achieved, labor cost and the construction period are greatly saved, and economic and social benefits are remarkable.
本发明属于建筑技术领域,具体为一种悬挑结构上安装施工升降机设计与施工方法。本发明包括:升降机基础设计、悬挑结构承载力复核计算、升降机基础施工、升降机安装。本发明通过升降机荷载作用下的悬挑结构的框架梁承载力验算,保障了升降机施工与结构安全。通过在悬挑结构施工前按照框架梁验算配筋面积施工配筋,解决了悬挑结构的框架梁底设置卸载支撑影响下道工序的施工技术难题。通过在悬挑结构上安装施工升降机,解决了施工现场不满足升降机安装空间及位置要求,安全可靠,大幅度节约人工费及工期,经济与社会效益显著。
Design and construction method for installing construction hoist on cantilever structure
悬挑结构上安装施工升降机设计与施工方法
ZUO TINGTING (Autor:in) / ZHANG AIJUN (Autor:in) / CAO ZHIWEI (Autor:in) / ZHU XIAORUI (Autor:in) / JIANG YULI (Autor:in)
08.03.2024
Patent
Elektronische Ressource
Chinesisch
Construction hoist foundation located on cantilever structure
Europäisches Patentamt | 2022
|Construction hoist foundation and construction method of construction hoist
Europäisches Patentamt | 2021
|