Construction hoist foundation located on cantilever structure
The construction hoist foundation comprises a basement top plate and a tower main body, a construction hoist is arranged on an outer frame of the tower main body, a circle of settlement post-cast strip is arranged close to the tower main body, and the construction hoist is close to a post-cast strip on the basement top plate. A building hoist foundation beam is poured on the basement top plate below the building hoist, a straining beam is fixed to the bottom of the basement top plate through bolts, the two ends of the straining beam are connected with the building hoist foundation beam and the tower frame column respectively, an inclined column is obliquely arranged below the straining beam, and the two ends of the inclined column are connected with the tower frame column and the building hoist foundation beam respectively. According to the construction hoist foundation, large-section tower frame columns of a tower serve as a supporting structure, a stress system of foundation beams, inclined columns and straining beams is established, a stable triangular supporting system is formed, the load of a construction hoist is transmitted to the tower frame columns as much as possible, and foundation reinforcing measures are limited within the range of one floor.
本发明公开了一种位于悬臂结构的施工升降机基础,包括地下室顶板和塔楼主体,所述塔楼主体的外框设置有施工升降机,临近塔楼主体设有一圈沉降后浇带,施工升降机邻近地下室顶板上的后浇带,施工升降机下方的地下室顶板上浇筑施工升降机基础梁,地下室顶板底部通过螺栓固定有拉梁,且拉梁两端分别连接有施工升降机基础梁和塔楼框柱,拉梁下方倾斜设置有斜柱,且斜柱两端分别连接塔楼框柱和施工升降机基础梁。本发明施工升降机基础以塔楼的大截面塔楼框柱作为支承结构,建立了“基础梁+斜柱+拉梁”的受力体系,形成了稳定的三角支撑体系,将施工升降机荷载尽可能传递至塔楼框柱,将基础加固措施限制在一层范围。
Construction hoist foundation located on cantilever structure
The construction hoist foundation comprises a basement top plate and a tower main body, a construction hoist is arranged on an outer frame of the tower main body, a circle of settlement post-cast strip is arranged close to the tower main body, and the construction hoist is close to a post-cast strip on the basement top plate. A building hoist foundation beam is poured on the basement top plate below the building hoist, a straining beam is fixed to the bottom of the basement top plate through bolts, the two ends of the straining beam are connected with the building hoist foundation beam and the tower frame column respectively, an inclined column is obliquely arranged below the straining beam, and the two ends of the inclined column are connected with the tower frame column and the building hoist foundation beam respectively. According to the construction hoist foundation, large-section tower frame columns of a tower serve as a supporting structure, a stress system of foundation beams, inclined columns and straining beams is established, a stable triangular supporting system is formed, the load of a construction hoist is transmitted to the tower frame columns as much as possible, and foundation reinforcing measures are limited within the range of one floor.
本发明公开了一种位于悬臂结构的施工升降机基础,包括地下室顶板和塔楼主体,所述塔楼主体的外框设置有施工升降机,临近塔楼主体设有一圈沉降后浇带,施工升降机邻近地下室顶板上的后浇带,施工升降机下方的地下室顶板上浇筑施工升降机基础梁,地下室顶板底部通过螺栓固定有拉梁,且拉梁两端分别连接有施工升降机基础梁和塔楼框柱,拉梁下方倾斜设置有斜柱,且斜柱两端分别连接塔楼框柱和施工升降机基础梁。本发明施工升降机基础以塔楼的大截面塔楼框柱作为支承结构,建立了“基础梁+斜柱+拉梁”的受力体系,形成了稳定的三角支撑体系,将施工升降机荷载尽可能传递至塔楼框柱,将基础加固措施限制在一层范围。
Construction hoist foundation located on cantilever structure
一种位于悬臂结构的施工升降机基础
HAN JUN (Autor:in) / MA TIANYU (Autor:in) / TENG SHIHUA (Autor:in) / DUAN BO (Autor:in) / YANG WEI (Autor:in) / MA KUI (Autor:in) / FU WEICAI (Autor:in) / WU YUTONG (Autor:in) / HU SHENGYOU (Autor:in) / LI ZIXU (Autor:in)
18.10.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction hoist foundation and construction method of construction hoist
Europäisches Patentamt | 2021
|Design and construction method for installing construction hoist on cantilever structure
Europäisches Patentamt | 2024
|Basement roof construction hoist foundation construction method
Europäisches Patentamt | 2023
|