Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Deformation joint leakage treatment method
A deformation joint leakage treatment method is used for conducting leaking stoppage treatment on a deformation joint with water leakage, an original embedded water stop belt in the deformation joint is invalid, and the leaking stoppage treatment comprises the following steps that embedded stoppers in the deformation joint are removed, and the deformation joint is cleaned; an elastic material is placed on the ineffective embedded water-stop belt, and an elastic filling layer is formed; a first grouting pipe is inserted into the elastic filling layer; a quick-setting material is adopted for blocking, a blocking layer is formed on the elastic filling layer, the first grouting pipe and the elastic filling layer are fixed, and after the blocking layer is formed, a grouting opening of the first grouting pipe is exposed out of the surface of the blocking layer; and a first grouting material is injected into the deformation joint through the first grouting pipe, and leakage water in the deformation joint is blocked.
一种变形缝渗漏处理方法,用于对渗漏水的变形缝进行堵漏处理,该变形缝内原有的內埋止水带已失效,所述堵漏处理包括如下步骤:去除所述变形缝内的嵌堵物,并清理所述变形缝;在已失效的所述內埋止水带上放置弹性材料,形成弹性填充层;将第一注浆管插设在所述弹性填充层上;采用速凝材料进行封堵,在所述弹性填充层上形成封堵层,并对所述第一注浆管与所述弹性填充层进行固定,所述封堵层形成后所述第一注浆管的注浆口露出于所述封堵层表面;通过所述第一注浆管将第一注浆材料注入至所述变形缝中,实现对所述变形缝中渗漏水的封堵。
Deformation joint leakage treatment method
A deformation joint leakage treatment method is used for conducting leaking stoppage treatment on a deformation joint with water leakage, an original embedded water stop belt in the deformation joint is invalid, and the leaking stoppage treatment comprises the following steps that embedded stoppers in the deformation joint are removed, and the deformation joint is cleaned; an elastic material is placed on the ineffective embedded water-stop belt, and an elastic filling layer is formed; a first grouting pipe is inserted into the elastic filling layer; a quick-setting material is adopted for blocking, a blocking layer is formed on the elastic filling layer, the first grouting pipe and the elastic filling layer are fixed, and after the blocking layer is formed, a grouting opening of the first grouting pipe is exposed out of the surface of the blocking layer; and a first grouting material is injected into the deformation joint through the first grouting pipe, and leakage water in the deformation joint is blocked.
一种变形缝渗漏处理方法,用于对渗漏水的变形缝进行堵漏处理,该变形缝内原有的內埋止水带已失效,所述堵漏处理包括如下步骤:去除所述变形缝内的嵌堵物,并清理所述变形缝;在已失效的所述內埋止水带上放置弹性材料,形成弹性填充层;将第一注浆管插设在所述弹性填充层上;采用速凝材料进行封堵,在所述弹性填充层上形成封堵层,并对所述第一注浆管与所述弹性填充层进行固定,所述封堵层形成后所述第一注浆管的注浆口露出于所述封堵层表面;通过所述第一注浆管将第一注浆材料注入至所述变形缝中,实现对所述变形缝中渗漏水的封堵。
Deformation joint leakage treatment method
一种变形缝渗漏处理方法
LIN YANG (Autor:in) / MA ZHENSHI (Autor:in) / SHEN JIE (Autor:in) / MAO SIQIONG (Autor:in) / WU CHAO (Autor:in) / QIAN HENG (Autor:in) / WU YONG (Autor:in) / ZHUANG GUOQIANG (Autor:in)
29.03.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underground space bottom plate deformation joint leakage treatment method
Europäisches Patentamt | 2023
|Building deformation joint leakage maintenance method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2015
|Repair structure for deformation joint leakage treatment and construction method thereof
Europäisches Patentamt | 2024
|Treatment method for deformation joint leakage of side wall of building
Europäisches Patentamt | 2022
|