Auxiliary device for cofferdam steel pipe pile forming and pile forming method
According to the auxiliary device for cofferdam steel pipe pile forming and the pile forming method, the water flow rotary cutting device and the air lift reverse circulation device are combined on the cylindrical shell, and when steel pipe pile forming is conducted on a hard clay layer, hard clay at the front end of a steel pipe pile can be cut and stripped through an ultrahigh-pressure deflection water jet cutter of the water flow rotary cutting device; and then mud formed by the hard clay is removed through the gas lift reverse circulation device, the pile end blocking effect easily occurring in the process that the steel pipe pile enters the hard clay layer is broken, and the cofferdam steel pipe pile is helped to smoothly penetrate to the preset elevation. The method can effectively solve the problem that a traditional high-frequency vibratory hammer inserting and driving pile-forming construction technology is only suitable for a conventional construction environment and cannot adapt to a complex geological environment mainly comprising a hard clay layer and a soft fine sand layer, cofferdam steel pipe piles can be rapidly formed, and the construction efficiency is effectively improved.
本发明提供一种围堰钢管桩成桩的辅助装置及成桩方法,通过将水流旋切装置和气举反循环装置结合在柱形壳体上,对硬质黏土层进行钢管桩成桩时,可利用水流旋切装置的超高压偏角水刀将钢管桩前端的硬质黏土切割剥离,再通过气举反循环装置将硬质黏土形成的泥浆清除,破除钢管桩进入硬质黏土层的过程中容易出现的桩端闭塞效应,帮助围堰钢管桩顺利贯入至预设标高。本发明能够有效解决传统的高频率振动锤插打成桩施工技术仅适用于常规的施工环境,不能适应以硬质黏土层与柔软细砂层为主的复杂地质环境的问题,能够快速使围堰钢管桩成桩,有效提高施工效率。
Auxiliary device for cofferdam steel pipe pile forming and pile forming method
According to the auxiliary device for cofferdam steel pipe pile forming and the pile forming method, the water flow rotary cutting device and the air lift reverse circulation device are combined on the cylindrical shell, and when steel pipe pile forming is conducted on a hard clay layer, hard clay at the front end of a steel pipe pile can be cut and stripped through an ultrahigh-pressure deflection water jet cutter of the water flow rotary cutting device; and then mud formed by the hard clay is removed through the gas lift reverse circulation device, the pile end blocking effect easily occurring in the process that the steel pipe pile enters the hard clay layer is broken, and the cofferdam steel pipe pile is helped to smoothly penetrate to the preset elevation. The method can effectively solve the problem that a traditional high-frequency vibratory hammer inserting and driving pile-forming construction technology is only suitable for a conventional construction environment and cannot adapt to a complex geological environment mainly comprising a hard clay layer and a soft fine sand layer, cofferdam steel pipe piles can be rapidly formed, and the construction efficiency is effectively improved.
本发明提供一种围堰钢管桩成桩的辅助装置及成桩方法,通过将水流旋切装置和气举反循环装置结合在柱形壳体上,对硬质黏土层进行钢管桩成桩时,可利用水流旋切装置的超高压偏角水刀将钢管桩前端的硬质黏土切割剥离,再通过气举反循环装置将硬质黏土形成的泥浆清除,破除钢管桩进入硬质黏土层的过程中容易出现的桩端闭塞效应,帮助围堰钢管桩顺利贯入至预设标高。本发明能够有效解决传统的高频率振动锤插打成桩施工技术仅适用于常规的施工环境,不能适应以硬质黏土层与柔软细砂层为主的复杂地质环境的问题,能够快速使围堰钢管桩成桩,有效提高施工效率。
Auxiliary device for cofferdam steel pipe pile forming and pile forming method
围堰钢管桩成桩的辅助装置及成桩方法
WU GUOLIANG (Autor:in) / CHENG YONGCHUN (Autor:in) / TRAN HAI (Autor:in) / DU MINGQU (Autor:in) / LIU WENCONG (Autor:in) / WANG LIYUAN (Autor:in) / TANG HONG (Autor:in) / XUE XIAOLONG (Autor:in) / QIN XIANGXING (Autor:in) / HAN YU (Autor:in)
05.04.2024
Patent
Elektronische Ressource
Chinesisch
Cofferdam steel pipe pile and cofferdam closure deviation correction construction method
Europäisches Patentamt | 2021
|Method for locking steel pipe pile cofferdam structure
Europäisches Patentamt | 2023
|Rapid construction method for steel pipe pile cofferdam
Europäisches Patentamt | 2023
|