Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a method for connecting prefabricated bridge decks of steel-concrete composite beams. The prefabricated bridge deck slab A of a specific structure is adopted, the structure of the prefabricated bridge deck slab A is improved, meanwhile, glue joints are adopted to replace original transverse wet joints, and high-performance and high-strength materials are combined when longitudinal wet joints are constructed; according to the improvement, in the aspect of construction, construction procedures are simplified, manual operation is reduced, the construction period and cost are saved, construction efficiency is improved, and rapid assembly is achieved; wet joints and diseases at the joints of shear nails and main beams are reduced on the prefabricated bridge deck slab structure, the overall stress performance of the structure is improved, the overall construction effect of a bridge is finally improved, and green construction is achieved.
本发明公开了一种钢混组合梁预制桥面板连接方法。本发明采用特定结构的预制桥面板A,不仅对预制桥面板A的结构进行了改进,同时还采用胶接缝替代原有的横向湿接缝,并在纵向湿接缝构造时结合高性能高强度材料;上述改进不仅在施工方面达到简化施工工序,减少人工操作,节约工期和成本,提高施工效率实现快速拼装;在预制桥面板结构上减少湿接缝和剪力钉与主梁相接处病害,提高结构整体受力性能,最终提高桥梁整体施工功效,实现绿色化施工。
The invention discloses a method for connecting prefabricated bridge decks of steel-concrete composite beams. The prefabricated bridge deck slab A of a specific structure is adopted, the structure of the prefabricated bridge deck slab A is improved, meanwhile, glue joints are adopted to replace original transverse wet joints, and high-performance and high-strength materials are combined when longitudinal wet joints are constructed; according to the improvement, in the aspect of construction, construction procedures are simplified, manual operation is reduced, the construction period and cost are saved, construction efficiency is improved, and rapid assembly is achieved; wet joints and diseases at the joints of shear nails and main beams are reduced on the prefabricated bridge deck slab structure, the overall stress performance of the structure is improved, the overall construction effect of a bridge is finally improved, and green construction is achieved.
本发明公开了一种钢混组合梁预制桥面板连接方法。本发明采用特定结构的预制桥面板A,不仅对预制桥面板A的结构进行了改进,同时还采用胶接缝替代原有的横向湿接缝,并在纵向湿接缝构造时结合高性能高强度材料;上述改进不仅在施工方面达到简化施工工序,减少人工操作,节约工期和成本,提高施工效率实现快速拼装;在预制桥面板结构上减少湿接缝和剪力钉与主梁相接处病害,提高结构整体受力性能,最终提高桥梁整体施工功效,实现绿色化施工。
Connecting method for prefabricated bridge deck slabs of steel-concrete composite beam
一种钢混组合梁预制桥面板连接方法
12.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Prefabricated bridge deck steel-concrete composite beam construction method
Europäisches Patentamt | 2021
|Spliced prefabricated steel concrete beam bridge deck
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2022
|Steel concrete beam bridge deck slab prefabricated construction method
Europäisches Patentamt | 2020
|Prefabricated installation construction method for steel-concrete composite beam bridge deck slab
Europäisches Patentamt | 2022
|