Pile leg refitting and building method
The invention relates to the technical field of ocean platforms, in particular to a pile leg modification and construction method which comprises the following steps: modifying an original pile leg: integrally disassembling the original pile leg from a platform, and cutting the original pile leg into two sections to form a first branch pile leg and a second branch pile leg; the first branch pile leg and the second branch pile leg are both fixed to the jig frame; inclined pipes which are not reserved on the first branch pile leg and the second branch pile leg are removed; transformation of the first branch pile leg and the second branch pile leg is completed; extension pile legs are manufactured, specifically, extension main side pipes are arranged on the jig frame according to the needed length, and the extension main side pipes are positioned; a plurality of second supporting and reinforcing structures are welded and installed between the adjacent extended main side pipes, and manufacturing of the extended pile leg is completed; the first branch pile leg, the second branch pile leg and the extension pile leg are welded, and modification construction of the pile leg is completed. The production cost can be reduced, the material consumption is reduced, the manufacturing period is shortened, and the construction difficulty is reduced.
本发明涉及海洋平台技术领域,尤其涉及一种桩腿改装建造方法,其包括如下步骤:原有桩腿改造:将原有桩腿从平台上整体拆下,将原有桩腿截成两段,形成第一分桩腿和第二分桩腿;将第一分桩腿和第二分桩腿均固定在胎架上;对第一分桩腿和第二分桩腿上不预留的斜管进行拆除;完成第一分桩腿和第二分桩腿的改造;延长桩腿制作:在胎架上,按照所需长度布置延长主舷管,并对延长主舷管进行定位;在相邻的延长主舷管之间焊接安装多个第二支撑加强结构,完成延长桩腿的制作;桩腿总组:将第一分桩腿、第二分桩腿和延长桩腿进行焊接,完成桩腿的改装建造。本发明能够降低生产成本,降低材料的耗费,缩短制作周期,降低施工难度。
Pile leg refitting and building method
The invention relates to the technical field of ocean platforms, in particular to a pile leg modification and construction method which comprises the following steps: modifying an original pile leg: integrally disassembling the original pile leg from a platform, and cutting the original pile leg into two sections to form a first branch pile leg and a second branch pile leg; the first branch pile leg and the second branch pile leg are both fixed to the jig frame; inclined pipes which are not reserved on the first branch pile leg and the second branch pile leg are removed; transformation of the first branch pile leg and the second branch pile leg is completed; extension pile legs are manufactured, specifically, extension main side pipes are arranged on the jig frame according to the needed length, and the extension main side pipes are positioned; a plurality of second supporting and reinforcing structures are welded and installed between the adjacent extended main side pipes, and manufacturing of the extended pile leg is completed; the first branch pile leg, the second branch pile leg and the extension pile leg are welded, and modification construction of the pile leg is completed. The production cost can be reduced, the material consumption is reduced, the manufacturing period is shortened, and the construction difficulty is reduced.
本发明涉及海洋平台技术领域,尤其涉及一种桩腿改装建造方法,其包括如下步骤:原有桩腿改造:将原有桩腿从平台上整体拆下,将原有桩腿截成两段,形成第一分桩腿和第二分桩腿;将第一分桩腿和第二分桩腿均固定在胎架上;对第一分桩腿和第二分桩腿上不预留的斜管进行拆除;完成第一分桩腿和第二分桩腿的改造;延长桩腿制作:在胎架上,按照所需长度布置延长主舷管,并对延长主舷管进行定位;在相邻的延长主舷管之间焊接安装多个第二支撑加强结构,完成延长桩腿的制作;桩腿总组:将第一分桩腿、第二分桩腿和延长桩腿进行焊接,完成桩腿的改装建造。本发明能够降低生产成本,降低材料的耗费,缩短制作周期,降低施工难度。
Pile leg refitting and building method
桩腿改装建造方法
XU ZHIQUAN (Autor:in) / WANG DONGMEI (Autor:in) / SHAO DANDAN (Autor:in) / HE KAIPING (Autor:in) / DU WEI (Autor:in) / ZHANG HAO (Autor:in) / SUN GUANGJIE (Autor:in)
03.05.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2016
|Refitting method for newly-added pile winding crane of wind power platform
Europäisches Patentamt | 2024
|Online Contents | 1997
FEATURES - Refitting the 'Ham 309'
Online Contents | 2000