Refitting method for newly-added pile winding crane of wind power platform
The invention discloses a modification method for a newly-added pile winding crane of a wind power platform, which comprises the following steps of: reinforcing and modifying an original pile fixing chamber, and performing segmented modification according to a structure; the pile winding crane base is prefabricated, and the structure of the pile winding crane base is manufactured; and the pile winding hoisting base is hoisted, the platform is lifted to a proper height in the pile inserting state, and positioning and welding are conducted. By additionally arranging the pile winding crane on the platform and accurately prefabricating and installing the pile winding crane, the hoisting capacity and the operation efficiency during wind power installation can be remarkably improved. The newly added pile winding crane enables the platform to independently complete the installation of the main tower of the wind driven generator without depending on the assistance of other floating cranes, so that the installation process is simplified, and the construction period is shortened. The manufactured wind power platform can meet the installation requirements of larger wind driven generators and can work under more complex sea conditions.
本发明公开了一种风电平台新加绕桩吊改装方法,包括以下步骤:对原有的固桩室进行加强改造,根据结构分段改造;绕桩吊底座预制,制作组成绕桩吊底座的结构;绕桩吊底座吊装,在插桩状态下提升平台至适当高度,进行定位与焊接。通过在平台上新增绕桩吊,并对其进行精确的预制和安装,可以显著提高风电安装时的起重能力和作业效率。新增加的绕桩吊使得平台能够独立完成风力发电机主塔的安装,无需依赖其他浮吊辅助,从而简化了安装过程并缩短了施工周期。造后的风电平台能够适应更大型风力发电机的安装需求,并且能够在更加复杂的海况下工作。
Refitting method for newly-added pile winding crane of wind power platform
The invention discloses a modification method for a newly-added pile winding crane of a wind power platform, which comprises the following steps of: reinforcing and modifying an original pile fixing chamber, and performing segmented modification according to a structure; the pile winding crane base is prefabricated, and the structure of the pile winding crane base is manufactured; and the pile winding hoisting base is hoisted, the platform is lifted to a proper height in the pile inserting state, and positioning and welding are conducted. By additionally arranging the pile winding crane on the platform and accurately prefabricating and installing the pile winding crane, the hoisting capacity and the operation efficiency during wind power installation can be remarkably improved. The newly added pile winding crane enables the platform to independently complete the installation of the main tower of the wind driven generator without depending on the assistance of other floating cranes, so that the installation process is simplified, and the construction period is shortened. The manufactured wind power platform can meet the installation requirements of larger wind driven generators and can work under more complex sea conditions.
本发明公开了一种风电平台新加绕桩吊改装方法,包括以下步骤:对原有的固桩室进行加强改造,根据结构分段改造;绕桩吊底座预制,制作组成绕桩吊底座的结构;绕桩吊底座吊装,在插桩状态下提升平台至适当高度,进行定位与焊接。通过在平台上新增绕桩吊,并对其进行精确的预制和安装,可以显著提高风电安装时的起重能力和作业效率。新增加的绕桩吊使得平台能够独立完成风力发电机主塔的安装,无需依赖其他浮吊辅助,从而简化了安装过程并缩短了施工周期。造后的风电平台能够适应更大型风力发电机的安装需求,并且能够在更加复杂的海况下工作。
Refitting method for newly-added pile winding crane of wind power platform
一种风电平台新加绕桩吊改装方法
ZHONG WEIHUAI (Autor:in) / JIE BIN (Autor:in) / HU ZHAOJIE (Autor:in) / XIONG JIN (Autor:in) / ZHU JUNYAN (Autor:in) / LUO DONGHAO (Autor:in)
29.10.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2016
|Online Contents | 1997
FEATURES - Refitting the 'Ham 309'
Online Contents | 2000
Tower crane latticed column pile foundation bearing platform
Europäisches Patentamt | 2022
|