Multi-capsule soil deformation control device with controllable expansion sequence
The invention discloses an expansion sequence controllable multi-capsule soil deformation control device which comprises a deformation control assembly, a grouting pump, a grouting inner pipe, a grouting outer pipe, grouting capsules, a flow meter and a pressure gauge, the grouting inner pipe is communicated with the grouting pump, the grouting outer pipe is arranged on the outer side of the grouting inner pipe in a sleeving mode, the flow meter is arranged on the outer side of the grouting capsule, and the pressure gauge is arranged on the outer side of the grouting capsule. The grouting bag body is fixed to the outer side of the grouting outer pipe, the flow meter and the pressure gauge are both fixed to the grouting inner pipe, and a first grouting hole is formed in the position, located in the grouting bag body, of the grouting outer pipe. Through cooperation of the deformation control assembly and the grouting assembly, a constructor can freely control the sequence of bag body grouting when controlling deformation of the soil body, and therefore deformation of the soil body can be more conveniently and accurately controlled.
本发明公开了一种扩张顺序可控的多囊体土体变形控制装置,包括变形控制组件,包括注浆泵、注浆内管、注浆外管、注浆囊体、流量计以及压力表,所述注浆内管与所述注浆泵连通,所述注浆外管套设于所述注浆内管外侧,所述注浆囊体固定于所述注浆外管外侧,所述流量计与所述压力表均固定于所述注浆内管上,所述注浆外管上并位于所述注浆囊体内开设有第一注浆孔。本发明通过变形控制组件和注浆组件之间的配合,使得施工人员在对土体变形控制时能够自由控制囊体注浆的顺序,从而更加方便精准的对土体的变形进行控制。
Multi-capsule soil deformation control device with controllable expansion sequence
The invention discloses an expansion sequence controllable multi-capsule soil deformation control device which comprises a deformation control assembly, a grouting pump, a grouting inner pipe, a grouting outer pipe, grouting capsules, a flow meter and a pressure gauge, the grouting inner pipe is communicated with the grouting pump, the grouting outer pipe is arranged on the outer side of the grouting inner pipe in a sleeving mode, the flow meter is arranged on the outer side of the grouting capsule, and the pressure gauge is arranged on the outer side of the grouting capsule. The grouting bag body is fixed to the outer side of the grouting outer pipe, the flow meter and the pressure gauge are both fixed to the grouting inner pipe, and a first grouting hole is formed in the position, located in the grouting bag body, of the grouting outer pipe. Through cooperation of the deformation control assembly and the grouting assembly, a constructor can freely control the sequence of bag body grouting when controlling deformation of the soil body, and therefore deformation of the soil body can be more conveniently and accurately controlled.
本发明公开了一种扩张顺序可控的多囊体土体变形控制装置,包括变形控制组件,包括注浆泵、注浆内管、注浆外管、注浆囊体、流量计以及压力表,所述注浆内管与所述注浆泵连通,所述注浆外管套设于所述注浆内管外侧,所述注浆囊体固定于所述注浆外管外侧,所述流量计与所述压力表均固定于所述注浆内管上,所述注浆外管上并位于所述注浆囊体内开设有第一注浆孔。本发明通过变形控制组件和注浆组件之间的配合,使得施工人员在对土体变形控制时能够自由控制囊体注浆的顺序,从而更加方便精准的对土体的变形进行控制。
Multi-capsule soil deformation control device with controllable expansion sequence
一种扩张顺序可控的多囊体土体变形控制装置
TAO YUANQIN (Autor:in) / SUN HONGLEI (Autor:in) / PAN-SUN JUEXU (Autor:in) / ZHOU ZELING (Autor:in) / ZHOU KANGMIN (Autor:in)
03.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Soil deformation control system based on composite capsule
Europäisches Patentamt | 2024
|Construction method for controllable anchor expansion structure of soft rock-soil layer branch plate
Europäisches Patentamt | 2024
|Foundation pit supporting device with controllable deformation and construction method thereof
Europäisches Patentamt | 2023
|